HengshuiElectric rope climbing machine elevatorR&D testing methods

announcer:hp935HP175192871 release time:2024-03-15 11:52:57

Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

Advantages of electric elevator rotary valve: Simplify the installation of electric elevator pipelines; The operation is more convenient, and the valve can be opened and closed at any time; The installation of a rotary valve reduces the friction of the sealing components; Compact structure,HengshuiManned electric elevator, small size, and space saving; Increased the service life of electric elevator pipelines and solved the problem of easy oil leakage.

Hengshui.The inner bearing of the roller in the device is in good condition, and a complete grease film surface is maintained between the curved surface of the roller and the main chord of the aluminum alloy electric elevator. A good grease film surface can reduce wear and noise

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

.News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations, making high-altitude operations easier


HengshuiElectric rope climbing machine elevatorR&D testing methods



The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations which can also be selected according to customer requirements to meet customer ideal requirements.

The working principle of the aluminum alloy lifting platform is that hydraulic oil is composed of a vane pump to form a certain pressure, which enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve,HengshuiElectric hydraulic elevator,HengshuiElectric passenger lift, hydraulic control one-way valve, and balance valve

Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability, and the production should meet the design requirements.

Encyclopedic knowledge.From the perspective of the safety performance of the machinery itself, those that have undergone national safety certification will not have significant safety issues. The main problem is that after using the electric elevator for a period of time, mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.


HengshuiElectric rope climbing machine elevatorR&D testing methods



The wall bracket of the construction electric elevator should be intact and reliably fixed and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

details.When the foundation is set on the roof or floor structure, smooth lifting and low noise.

During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.