LipayaPrice of 400 KVA box transformerThe overall scale of is larger

announcer:hp122HP117294921 release time:2024-03-01 09:04:27

LipayaOil immersed transformer thermometer,

Oil leakage of porcelain pot and laminated glass oil level gauge

The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong so that the bolts are not tightened well, resulting in oil leakage.

Lipaya.Several detection methods for installing transformer

Causes of fire in power transformer

.The oil in the machinery and equipment of the oil storage tank shall generally stand for more than 8h before sampling; it is not necessary to stand when sampling on the running power transformer.

The key reason for oil leakage is that there are defects in cast iron parts

Operation of oil immersed transformer


LipayaPrice of 400 KVA box transformerThe overall scale of is larger



35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.

What is the cause of power transformer core failure?

& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).

Statistics.If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.

The noise of dry-type transformer comes from

Careless maintenance and insulation damage


LipayaPrice of 400 KVA box transformerThe overall scale of is larger



Operation and maintenance management of oil immersed transformer

quality standard.After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.

Power transformer is indispensable for power stations and substations, but we must pay attention to many problems in the whole process of applying power transformer.

The raw materials of Fushi blue can be used for bonding so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.

Lipaya.Then clamp the branch pipe with your thumb,LipayaRecycling distribution transformer, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.

The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the load can be connected.