ValensbeckModel and meaning of oil immersed transformerWhat matters should be paid attention to during installation and maintenance

announcer:hp122HP117294921 release time:2024-02-23 11:11:25

Before no-load impact closing,ValensbeckBox transformer 500, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.

The key reason for oil leakage is that there are defects in cast iron parts

Valensbeck.It is understood that in China, S7 Series lossless distribution transformers were selected in China to replace the high energy consumption transformers of jb1300-73 and jb500 - Specifications operating in the power network at that time. Since the 19th century, urban power grids have been transformed all over the country, and S9 series distribution transformers have been used to replace S7 Series. In recent years,ValensbeckDifference between box transformer and transformer, S13 and S15 commodities are gradually selected in large quantities in the transformation of urban and rural power networks in China, and their full load loss is 50% - 80% less than that of S9 transformer.

Oil leakage at electric welding position

.Power transformer plant

Power transformer plant

The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.


ValensbeckModel and meaning of oil immersed transformerWhat matters should be paid attention to during installation and maintenance



It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, production process and quality standard of electromagnetic shielding.

Power transformer is indispensable for power stations and substations, but we must pay attention to many problems in the whole process of applying power transformer.

In specific daily life, oil immersed transformers are released outward in the form of waves. This kind of wave is like a tide. It is also a kind of kinetic energy. In fact, the wave height of oil immersed transformer also shows the size of kinetic energy. Generally, computer automatic system is used to control the wavelength and frequency of electromagnetic wave. The longer the light wavelength is, the greater the output power is. On the contrary, it is very small.

middleman.In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.

For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

Oil immersed transformer operation


ValensbeckModel and meaning of oil immersed transformerWhat matters should be paid attention to during installation and maintenance



Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.

Sampling inspection.Careless maintenance and insulation damage

The appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately, and each pump is driven by 100kW motor, so the usual load is 200 KW, CST = 0. One 750kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only 34%

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface,ValensbeckDifference between rectifier transformer and power transformer, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.

Valensbeck.& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.

The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.

Different diversion methods dry-type transformers mostly use silica gel waterproof casing, while oil transformers mostly use porcelain waterproof casing;