Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

The method and whole process of taking oil sample of power transformer are as follows:

Cladno.Once the insulation material of electrical equipment is overheated, the surrounding gas will cause a kind of odor. This kind of odor can be sniffed out by normal patrol staff. When you smell such odor during normal inspection, porcelain,Cladno630 dry type transformer manufacturer, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.

.The flange surface is uneven, and the installation and processing process is wrong, so that the bolts are not tightened well resulting in oil leakage.

The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, effectively deal with various faults of oil immersed transformer, make full use of the performance indicators and advantages of oil immersed transformer, and continuously improve the safety factor of oil immersed transformer. Ignition is a common fault of oil immersed transformer. The key fault of oil immersed transformer is short-circuit fault, and short-circuit fault is more general.


CladnoHigh voltage bushing of oil immersed transformerPackaging strategy



There are many connection groups of dry-type transformers, and the selected structures and connections are also different. Then, what are the groups of dry-type transformers? How to carry out the connection? Or basically introduce it with the network of dry-type transformer manufacturers.

The transformer manufacturer said that the temperature display equipment: the temperature change value is measured according to the PT100 temperature sensor embedded in the bottom voltage winding to immediately indicate the winding temperature of each phase (three-phase safety inspection and Zui large value indication, and the historical time Zui high temperature can be recorded). The Zui high temperature can be input and output as 420mA analog quantity. If it is to be far away (the distance can reach 1200m, the electronic computer can be equipped with an electronic computer socket, an intelligent transmitter, and 31 transformers can be detected. The over temperature alarm and trip of the system software can also be signaled by the resistor data of Pt100 thermistor sensor, so as to further improve the stability of the temperature maintenance system software.

After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.

middleman.A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?

The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below 2000kVA and the working voltage is below 35KV, which also ensures the rated voltage of 110kV; Oil immersed transformers are generally suitable for distribution equipment.

The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit but only as a maintenance line. Use the affirmation of the earth & ldquo; 0” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.


CladnoHigh voltage bushing of oil immersed transformerPackaging strategy



Difference between dry-type transformer and oil immersed transformer:

Standard requirements.When the transformer is out of phase, if the second phase is blocked there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

The selection shall be carried out according to the load characteristics of power. There are many types of power loads. Different dry-type transformers shall be used for different power loads. If the standard impulse level of power load is less than 150kV, class H dry-type transformers shall be used. If the standard impulse level of power load exceeds 150kV, epoxy resin adhesive shall be used to pour dry-type transformers.

It will also produce many faults, effectively deal with various faults of oil immersed transformer, make full use of the performance indicators and advantages of oil immersed transformer, and continuously improve the safety factor of oil immersed transformer. Ignition is a common fault of oil immersed transformer. The key fault of oil immersed transformer is short-circuit fault, and short-circuit fault is more general.

Cladno.Power transformer plant

Oil leakage of porcelain pot and laminated glass oil level gauge

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.