Arouca Procurement of dry type transformersWhat issues should be paid attention to in the season

announcer:hp122HP117294921 release time:2024-02-17 10:53:11

Equipped with a temperature controller, platinum thermistor (pt10) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.

After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.

Arouca .Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.

Power transformer factory

.When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.

For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.


Arouca Procurement of dry type transformersWhat issues should be paid attention to in the season



Oil leakage of cast iron parts

Transformer manufacturers generally adopt IP20 protective casing, which can avoid the entry of solid dirt with a diameter of more than 12mm, rats, snakes, cats, birds and other animals,Arouca Model and parameters of power transformer, resulting in vicious common faults such as short-circuit fault and power failure, and provide a safe natural barrier for the energized part. If the transformer equipment must be outdoors, IP23 protective casing can be adopted which can avoid being equally divided with the above IP20 protective effects However, IP23 casing will reduce the refrigeration capacity of the transformer, so pay attention to the reduction of its operating volume.

In fact, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.

manufacturer.Difference between dry-type transformer and oil immersed transformer:

Power transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.

Method and process of taking oil sample of power transformer


Arouca Procurement of dry type transformersWhat issues should be paid attention to in the season



Manufacturing process and steps of dry-type transformer

Welcome calls .(5) the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side it shall be installed between the disconnector and low-voltage composite insulator, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.

The cycle time of power-off cleaning and inspection shall be determined according to the surrounding environment and load conditions,Arouca Market price of scb11 dry type transformer, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, commerce,Arouca Maximum temperature of oil immersed transformer, airports, tunnel construction, chemical enterprises and factories.

The hanging core of dry-type transformer is a vital part

In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.