lush mountainTwo phase electric elevatorHow to measure good or bad

announcer:hp935HP175192871 release time:2024-02-16 10:40:48

Construction electric elevators outside the lightning protection range

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator with a size of 8 meters by 2 meters.

lush mountain.The down travel (limit) switch should be of the automatic reset type.

Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered down

.Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, and concrete strength report.

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, in addition to lighting and sound, stage machinery is particularly important on the stage. On the stage, there are suspension rods, suspension points, lighting bridges, lighting suspension cages, and fire curtains. Under the stage, there are lifting platforms, car platforms, turntables, and lifting orchestras. Some lifting platforms are equipped with turntables or there are lifting platforms in the turntables. Various types of lifting platforms are equipped in professional opera houses, dance theaters, drama theaters, and many internationally renowned music halls. It has the functions of quickly changing scenery, meeting the needs of stage craft layout, meeting the needs of stage design and choreographers,lush mountainElevator electric 6 meters, creating special atmosphere and effects,lush mountainScissor fork electric elevator, and changing the stage form according to the needs of the performance.

Is the water cooling and air cooling of the hydraulic station the same?

Use floor doors and cage door devices on construction sites where conditions permit.

management.When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

Setting requirements: The landing door should be standardized and tooled.

Implementing multiple shifts of homework should fill in and submit records according to regulations.


lush mountainTwo phase electric elevatorHow to measure good or bad



The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

Installation materials.Setting requirements: The landing door should be standardized and tooled.

The installation position of the lower limit switch. The installation position of the lower limit switch should ensure that the contact plate triggers the switch when the rated load of the suspension cage decreases, the contact plate should also be close to the triggering of the lower limit switch

Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

lush mountain.According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage, a T-shaped stage, or a hall.

The L distance depends on the selected wall mount model.

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.