KercladHydraulic mobile boarding bridgeWhat tests should be done before use

announcer:hp161HP196399230 release time:2024-02-15 12:56:11

After the boarding bridge work is completed, the workbench should be lowered to a low position.

Hydraulic boarding bridges should strictly adhere to the principle of being overweight, as overloading may cause damage to objects; Working on a lifting platform without protective barriers may cause personnel to fall and cause casualties.

Kerclad.The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use. Long term promotion of various brand products such as axle manufacturers, with complete designated products and guaranteed quality

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform,KercladFolding boarding bridge, and there is basically no change to the building structure.

.Reason for the lifting table not lowering: The lowering valve is malfunctioning and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button, check if the lowering valve is energized. If there is no electricity, try to eliminate it; If there is electricity, troubleshoot the lowering valve itself or replace the lowering valve. The lowering valve should be kept clean.

Reason for the lifting table not lowering: The lowering valve is malfunctioning, and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button, check if the lowering valve is energized. If there is no electricity, try to eliminate it; If there is electricity, troubleshoot the lowering valve itself or replace the lowering valve. The lowering valve should be kept clean.

There is a lot of noise generated when using a mobile hydraulic boarding bridge. So, where are these noises caused? In fact, pump stations, steel cylinders, and steel equipment are all sources of noise. Today we will analyze for you: 1. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations. After hearing the noise from the hydraulic boarding bridge, first check if there are any problems with the hydraulic pump station, motor, valve, and fixing device, and if the noise is caused by its vibration.


KercladHydraulic mobile boarding bridgeWhat tests should be done before use



For slopes that are unstable or unstable after earthwork excavation top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

When the boarding axle is far away from the frame the rod moves downward to open the air release valve,KercladPlatform boarding bridge, and the air in the air spring is atmospheric, and the body and frame then reduce to the original value. The dual or multi axle air suspension boarding axle can also be lifted on a single or multiple axle when unloaded or partially loaded, which can protect the raised tires. Simultaneously reducing incorrect guidance while reducing tire wear on other axles. In addition, there are other positive effects during the driving process. On the one hand, it generates appropriate stable force when unloaded and partially loaded, and on the other hand, it improves the adhesion of the drive shaft.

When confirming that the lip is fixed to the container, pull out the hook to hook it into the container, tighten the chain to ensure that it does not loosen, and press the brake blocks on both sides. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

Promotion.Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

Common&quo; Streamline” Open joint planning, with a welding area more than three times that of other traditional pipeline joints, greatly extending the service life and protection life.

During use, close attention should be paid to the condition of the equipment, and if there are any problems, the use should be stopped immediately.


KercladHydraulic mobile boarding bridgeWhat tests should be done before use



  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.

Work courses.As we all know

The appearance of the hydraulic boarding bridge provided by Qiaolai to customers, and the demand for boarding bridges is also increasing. However, there are not many manufacturers of corresponding boarding bridges. Many boarding bridge companies are leather bag companies and they do not produce them themselves, resulting in high prices. What is important is that they do not have a good understanding of the technology of car booths, and there are often deviations when passing on the technical requirements of direct customers to the manufacturers. Therefore, customers who purchase boarding bridges can directly find professional manufacturers. When choosing a boarding bridge, the first thing to consider is the range of use, frequency of work, utilization, rated weight, and other factors of the product, and choose a boarding bridge that is suitable for the requirements of the unit. Conduct market research based on the proposed technical parameters. The first condition for selecting a supplier is to consider the manufacturer of the boarding axle, and then the after-sales service capability. As long as it is a fixed boarding bridge with good product quality, excellent performance, and complete equipment, it can be chosen at a reasonable price. Long term promotion of axle manufacturer, 20 year old brand, with price advantages and guaranteed quality!

For slopes that are unstable or unstable after earthwork excavation, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

Kerclad.The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, according to the characteristics of the work,KercladAluminum alloy boarding bridge, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.

When working in foundation pits or depths, a helmet must be worn.

The electronic operation is very simple. With just one button, adjust the plate to reduce itself, and the hinge is used on the truck.