SergeCurved arm electric elevatorApplication in production plant

announcer:hp935HP175192871 release time:2024-02-11 13:23:33

In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between 1m and 2m. And there should be at least protective railings, a half height middle crossbar, and a toe board at least 150mm above the ground.

Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

Serge.Safety devices: Electric elevators for construction should be equipped with overload detection devices. When the load inside the cage exceeds 10% of the rated load capacity, the overload detection device will give a warning signal inside the cage,

In order to meet the needs of contemporary audiences and achieve perfect effects in addition to lighting and sound, stage machinery is particularly important on the stage. On the stage, there are suspension rods, suspension points, lighting bridges, lighting suspension cages,SergeSelf propelled electric elevator, and fire curtains. Under the stage, there are lifting platforms, car platforms, turntables, and lifting orchestras. Some lifting platforms are equipped with turntables, or there are lifting platforms in the turntables. Various types of lifting platforms are equipped in professional opera houses, dance theaters, drama theaters, and many internationally renowned music halls. It has the functions of quickly changing scenery, meeting the needs of stage craft layout meeting the needs of stage design and choreographers, creating special atmosphere and effects,SergeElectric basket elevator, and changing the stage form according to the needs of the performance.

.For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

Use floor doors and cage door devices on construction sites where conditions permit.


SergeCurved arm electric elevatorApplication in production plant



Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.

Aluminum alloy lifting platforms can be divided into single column aluminum alloy, double column aluminum alloy, three column and four column aluminum alloy. Can be used in factories, automated warehouses, parking lots, municipal facilities, docks, and installations

The L distance depends on the selected wall mount model.

Quality assurance.Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered down

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.


SergeCurved arm electric elevatorApplication in production plant



The advantages and disadvantages of several commonly used electric lifting mechanisms are as follows: hydraulic electric lifting mechanisms: using hydraulic technology,SergeUsed electric elevator, smooth lifting and low noise.

Equipment maintenance.High lifting height, using side mounted oil cylinders, stable operation, easy maintenance, and longer service life.

Non automatic reset upper and lower limit switches should be installed at both the upper and lower ends of the stroke, which should be able to cut off the power supply before the suspension cage and other mechanical stop devices (such as buffers),

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

Serge.The scaffolding of the parking platform should be laid tightly and firmly.

The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.