GiovillanosHow to select power transformerWhat are the characteristics of the production line at least

announcer:hp122HP117294921 release time:2024-02-11 11:16:42

GiovillanosDistribution 400 KVA transformer,

When sampling in bulk gasoline barrels, samples shall be selected according to 5% of the number of gasoline barrels but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles, and some immediately press the two edges together samples shall be taken according to 2% of the total number of barrels (bottles).

Some are tied with plastic tape, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.

Giovillanos.With Vietnam and Malaysia, China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition,GiovillanosFully sealed oil immersed power transformer, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.

For no-load impulse closing of transformer,GiovillanosThree phase transformer 100kW, pay attention to the following matters:

.If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.

For 630kVA power engineering transformer plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.


GiovillanosHow to select power transformerWhat are the characteristics of the production line at least



Noise dispersion of dry-type transformer

After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:

The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at 12 o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.

Inspection items.After the oil is drained, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

Dry type transformer company


GiovillanosHow to select power transformerWhat are the characteristics of the production line at least



It will also produce many faults, effectively deal with various faults of oil immersed transformer, make full use of the performance indicators and advantages of oil immersed transformer, and short-circuit fault is more general.

Where is good.Connection group structure of dry-type transformer

The transformer manufacturer said that the temperature display equipment: the temperature change value is measured according to the PT100 temperature sensor embedded in the bottom voltage winding to immediately indicate the winding temperature of each phase (three-phase safety inspection and Zui large value indication, and the historical time Zui high temperature can be recorded). The Zui high temperature can be input and output as 420mA analog quantity. If it is to be far away (the distance can reach 1200m, the electronic computer can be equipped with an electronic computer socket, an intelligent transmitter, and 31 transformers can be detected. The over temperature alarm and trip of the system software can also be signaled by the resistor data of Pt100 thermistor sensor, so as to further improve the stability of the temperature maintenance system software.

In terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;

Giovillanos.When the full load test is carried out and everything is normal, the load can be connected.

How much is the power transformer

During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.