UtrechtFixed hydraulic boarding axleThe variety is complete

announcer:hp161HP196399230 release time:2024-02-04 20:03:56

Portable hydraulic press boarding bridge: It is a widely used type, unloading, and transportation are not fixed or moving; Mobile hydraulic press boarding bridge: suitable for fixed and immovable goods such as ports, cargo platforms, warehouses, etc

  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.

Utrecht.Application of hydraulic boarding bridges: Hydraulic boarding bridges can be widely used in docks, platforms, warehouses etc. according to user needs. Special designs can be made in terms of external dimensions, load, etc. The fixed boarding bridge is installed on the side of the cargo platform, flush with the ground and side of the cargo platform. The bridge deck of a fixed boarding bridge can tilt up and down, and its outer end can be higher or lower than the plane of the cargo platform, which automatically attaches to the edge of the carriage, ensuring a smooth passage between the cargo platform and the carriage.

As we all know

.As an important part of the boarding bridge,UtrechtProvincial Mobile Boarding Bridge, the height can be adjusted according to the different vehicles of the goods,UtrechtHydraulic boarding bridge mobile type, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge as well as noise when the pump station enters the air.

Shake the handle to raise the boarding bridge to the height of the container.


UtrechtFixed hydraulic boarding axleThe variety is complete



After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, and forklifts and other vehicles can move and load goods in batches inside the truck. Only one person can work to achieve rapid loading and unloading of goods. It enables enterprises to reduce a large amount of labor, improve work efficiency, and obtain greater economic benefits.

When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.

Economic management.The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

The pressure on the axle will reduce the service life of the boarding axle.

Tighten the manual valve to close it.


UtrechtFixed hydraulic boarding axleThe variety is complete



Install a 5m high protective railing around the foundation pit of the simple boarding bridge, with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate, without the need for power supply and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, support first and then excavation,UtrechtDesign of boarding bridge, layered excavation, no overbreak&rquote; The principle of.

Recommendation and consultation.Embedded boarding bridge, as the name suggests, it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings. We are a long-term manufacturer of boarding bridges. Welcome to inquire

Features: Generally, domestic brands are the main products, with a lightweight boom design, which has a wide range of operations, lightweight flexibility, and high work efficiency. Large leg span, good stability, automatic detection of leg reverse force, stop getting on if any leg loosens. When the chassis power system malfunctions, ensure that the platform car can be lowered and the rotating mechanism can be manually rotated. The cylinder rod is protected by a protective sheath, and the arm head is equipped with a dustproof device.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

Utrecht.  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.

Portable hydraulic press boarding bridge: It is a widely used type, suitable for places where loading, unloading, and transportation are not fixed or moving; Mobile hydraulic press boarding bridge: suitable for fixed and immovable goods such as ports cargo platforms, warehouses, etc

During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.