KulicoroOil immersed transformer 2500kVAStructural features you need to understand

announcer:hp122HP117294921 release time:2024-01-29 17:13:27

The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults,KulicoroHow much is the price of 250kVA box transformer, common faults and impact. The work is diligent.

Oil leakage of porcelain pot and laminated glass oil level gauge

Kulicoro.Hand touch method for transformer inspection

Manufacturing process and steps of dry-type transformer

.& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.

How to reduce the failure of dry-type transformer?

Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil slow aging of insulation, two-color short circuit fault or short circuit to ground fault and dissolution of oil.


KulicoroOil immersed transformer 2500kVAStructural features you need to understand



35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.

Power transformer is indispensable for power stations and substations,KulicoroPrice of 1000kW dry type transformer, but we must pay attention to many problems in the whole process of applying power transformer.

The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection,KulicoroDistribution transformer installation, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.

assets.(I) the distance between the external contour of 10kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than 1m; At the angle with actual operation, a spacing of more than 2m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.

Wiring mode of dry-type transformer:

Wiring mode of dry-type transformer:


KulicoroOil immersed transformer 2500kVAStructural features you need to understand



Power transformers are used in all walks of life

How many?.For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.

With Vietnam and Malaysia, China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.

The key reason for oil leakage is that there are defects in cast iron parts

Kulicoro.For no-load impulse closing of transformer, pay attention to the following matters:

The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω, The resistor is generally more than 2000 & omega; According to Ohm's law, when the insulating layer is damaged, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.

The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.