polandMobile loading and unloading platformAll indicators reach the advanced level of the same industry

announcer:hp275HP127226562 release time:2024-01-29 13:10:10

Now with the arrival of summer, the aluminum alloy lifting platform will certainly suffer from high temperature and rainstorm in summer. It is easy to rust after a long time under this condition, which will seriously shorten the service life of the equipment and cause safety problems. So how should we prevent equipment rust?

02 The lifting platform adopts a fully hydraulic lifting mechanism, which can be operated inside the platform bucket and on the elevator body. 03 The working arm of the lifting platform can rotate 360 degrees. 04 The hydraulic system is equipped with a safety valve to prevent the main arm oil cylinder oil pipe from cracking. 05 The hydraulic legs are equipped with a hydraulic locking device to prevent the leg oil cylinder from retracting. 06 The hydraulic system is equipped with an automatic platform overload protection device, In order to ensure the safety of operators, each section of the working arm on the platform 07 is equipped with safety limit devices. The hydraulic system seals on the platform 08 are all well-known domestic and foreign brands, and the power of the entire vehicle 09 is a diesel engine with its own power supply. The power supply can also be used. The hydraulic lifting platform is equipped with an emergency lowering device in case of power outage. The 11 folding arm lifting platform product can also use a 50Hz, 380V power motor, and diesel engine dual power.

poland.Drop test to check if the braking interval of the safety governor meets the requirements of the rules. Equipment transfer maintenance: Check the coupling between the electric motor and the worm gear reducer, and dismantle the gearbox. Clean all components and seals,polandAluminum alloy double column lifting platform, replace excessively worn and deformed parts and smooth oil

Folding arm lifting platform product features 01 Folding arm lifting platform High altitude operation platform 360 degree rotation without external power supply, can work across obstacles, lifting smoothly and safely. The curved arm lifting platform adopts a curved arm working arm, and the scope and space of operation are not affected.

.Vibration aging treatment and effect judgment: According to the aging process plan, after setting the support points and vibration pickup points of the workpiece, use a rigid fixture to fix the exciter on the workpiece, and use the manual function of the equipment to test the vibration. It is determined that around 5300 revolutions is the resonance frequency of the component. The amplitude generated by the eccentric gear of the exciter in the fourth gear can meet the vibration processing requirements of the foundation seat so the excitation force is selected as the fourth gear.

Folding arm lifting platform product features 01 Folding arm lifting platform High altitude operation platform 360 degree rotation without external power supply, can work across obstacles lifting smoothly and safely. The curved arm lifting platform adopts a curved arm working arm, a guide rail elevator and the scope and space of operation are not affected.

Jinchuang lifting platform product feature 01 is mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and a lifting height of 1-25 meters, also known as a hydraulic elevator, can be installed indoors and outdoors. The lifting height is high and uses a side mounted oil cylinder, which runs smoothly, has low noise, is convenient for maintenance, and has a long service life. In case of a power outage, which is safe, convenient, fast and practical. The pit depth is generally 15cm-30cm, and the top layer height is not affected, The 04 pump station can be customized according to the on-site environment, suitable for 2-3 floors of steel structures or concrete factories. Both the internal and external parts can be used. The 05 pump station adopts a joint venture pump station and an imported pump station from Italy. If the speed requirement is too high, a joint venture customized pump station can be used to meet the ideal delivery requirements. The 06 oil cylinder and seals are made of imported components, solving the problem of unstable oil pressure for customers, The oil leakage problem of components 07. The oil cylinder is built into the platform 08. The heavy-duty steel wire rope wheel or weighted special chain ensures safety 09. The automatic insurance during the lifting process ensures vehicle safety 10. The synchronous device during the lifting process ensures that the vehicle may not overturn 11. The alarm setting before falling to the ground ensures the safety of the operator 12. The chain or steel wire rope fracture protection device 13. The hydraulic system pressure loss prevention protection device 14. The elevator special flat layer permanent magnet switch is selected, and the leveling accuracy is high. 16. Standard elevator boards, LCD display call boxes, relevant wiring harnesses, and connectors are selected. Beautiful appearance, easy operation, visual display of the position of the elevator car on the floor, wiring harness connected using connectors, with automatic and manual options.


polandMobile loading and unloading platformAll indicators reach the advanced level of the same industry



02 The lifting platform adopts a fully hydraulic lifting mechanism, which can be operated inside the platform bucket and on the elevator body. 03 The working arm of the lifting platform can rotate 360 degrees. 04 The hydraulic system is equipped with a safety valve to prevent the main arm oil cylinder oil pipe from cracking. 05 The hydraulic legs are equipped with a hydraulic locking device to prevent the leg oil cylinder from retracting. 06 The hydraulic system is equipped with an automatic platform overload protection device, In order to ensure the safety of operators, each section of the working arm on the platform 07 is equipped with safety limit devices. The hydraulic system seals on the platform 08 are all well-known domestic and foreign brands, and the power of the entire vehicle 09 is a diesel engine with its own power supply. The power supply can also be used. The hydraulic lifting platform is equipped with an emergency lowering device in case of power outage. The 11 folding arm lifting platform product can also use a 50Hz, 380V power motor, and diesel engine dual power.

  ?? When the construction supervisory department fulfills its safety supervision and inspection responsibilities, it shall order the immediate elimination of potential safety hazards in the production of construction elevators and cargo elevators discovered during the inspection. If safety cannot be guaranteed before or during the elimination of major production safety hazards, it shall be ordered to evacuate workers from the hazardous area or temporarily stop construction. In the work of hazard investigation and control, the investigation shall be serious, the rectification shall be resolute, and the results shall be consolidated.

The lifting foundation of the platform is a large structural component made of alloy steel plates with different thicknesses that are welded together. The welding amount is large, the structural shape is complex, and residual stress is inevitably generated during the manufacturing process. In order to prevent deformation of the components due to changes in residual stress during use, it is necessary to perform stress relief treatment on the completed components.

Quality recommendation.When the lifting base plate descends, the safety net below immediately stops running and descends when encountering obstacles.

The vibration frequency should be set to obtain large dynamic stress with low energy consumption, and the resonance frequency should be used to handle time dependent vibration. However, there may be one or more resonance peaks in large components, which slowly increases the speed of the excitation motor from 0, and determines the relationship curve between the amplitude of the workpiece and the motor speed to determine the resonance point of the workpiece. According to the scanning curve, a large acceleration was obtained at 5366r/min, so 5366r/min was determined as the aging frequency.

Outbound call form: Outbound call boxes are pre embedded or installed in a column style on the wall or ground near the parking floor above and below the platform, and are linked to operate the platform up and down.


polandMobile loading and unloading platformAll indicators reach the advanced level of the same industry



When the lifting base plate descends the safety net below immediately stops running and descends when encountering obstacles.

For more, please check.The safety control voltage of 18 is selected with rolling guide shoes, high accuracy, wear resistance, and stable lifting. The characteristics of the Jinchuang lifting platform are as follows: 1. There is no need for a machine room above the shaft. 2. The hydraulic elevator is not equipped with a counterweight device to improve the utilization rate of the shaft area. 3. The load and load cylinder of the hydraulic elevator directly act on the foundation pit, and the strength requirements of the shaft are low, Brick or brick concrete structure hoistway can be used for Jinchuang lifting platform safety and stability advantages. Overflow valve: It can prevent system pressure from being too high during upward movement. Emergency manual valve: In case of power failure, filter cover, inspection hole, hydraulic oil pipe and other parts, it is necessary to avoid dust during the system oil passage. The disassembled parts must be thoroughly cleaned before opening. When disassembling the hydraulic oil tank filler cap, first remove the soil around the tank cap. After loosening the tank cap, remove any remaining debris from the joint area (do not rinse with water to prevent water from seeping into the tank). Only after confirming cleanliness can the tank cap be opened. When using materials and hammers, materials that do not remove fiber impurities and specialized hammers with rubber attached to the surface should be selected. Hydraulic components and hydraulic hoses should be carefully cleaned, dried with high-pressure air, and then assembled. Choose a well packaged filter element (the inner packaging is damaged, although the filter element is intact,polandSelf propelled mast lifting platform, it may also be unclean). When changing the oil, clean the filter at the same time. Before installing the filter element, carefully clean the bottom dirt inside the filter housing with materials.

Applicable environment: Indoor or outdoor Applicable temperature: Safety device Safety rocker: When the equipment is running and rising, the rocker will automatically prevent wheelchair platform.

poland.The selection of vibration pickup points refers to the placement point of the sensor, which is used to measure the vibration amplitude of the workpiece. According to GB/T25712-2010, the acceleration sensor should be placed on the workpiece with a certain rigidity and a large amplitude, and its testing direction should be adjusted to be perpendicular to the plane where the effective zone of the vibration mode is located. Considering the complex structure of the lifting foundation workpiece and the uneven thickness of each component, the vibration pickup point is set in a thick area in the middle of the component.

Power supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.

Jinchuang lifting platform product feature 01 is mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and a lifting height of 1-25 meters, a guide rail elevator, also known as a hydraulic elevator, can be installed indoors and outdoors. The lifting height is high and uses a side mounted oil cylinder, has low noise, and has a long service life. In case of a power outage, manual emergency descent can be used which is safe, convenient, fast, and practical. The pit depth is generally 15cm-30cm, and the top layer height is not affected, The 04 pump station can be customized according to the on-site environment, suitable for 2-3 floors of steel structures or concrete factories. Both the internal and external parts can be used. The 05 pump station adopts a joint venture pump station and an imported pump station from Italy. If the speed requirement is too high, a joint venture customized pump station can be used to meet the ideal delivery requirements. The 06 oil cylinder and seals are made of imported components, solving the problem of unstable oil pressure for customers, The oil leakage problem of components 07. The oil cylinder is built into the platform 08. The heavy-duty steel wire rope wheel or weighted special chain ensures safety 09. The automatic insurance during the lifting process ensures vehicle safety 10. The synchronous device during the lifting process ensures that the vehicle may not overturn 11. The alarm setting before falling to the ground ensures the safety of the operator 12. The chain or steel wire rope fracture protection device 13. The hydraulic system pressure loss prevention protection device 14. The elevator special flat layer permanent magnet switch is selected, The leveling effect is good. 15. The distance between heavy and empty loads is small, and the leveling accuracy is high. 16. Standard elevator boards, LCD display call boxes,polandAluminum alloy single column lifting platform, relevant wiring harnesses, and connectors are selected. Beautiful appearance, easy operation, visual display of the position of the elevator car on the floor, with automatic and manual options.