After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

Siroli.The counterweight steel wire rope should be equipped with an anti loosening device that is sensitive and reliable.

The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

.The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer

Protective measures should comply with regulatory requirements.

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.


SiroliElectric banner elevatorWhat is it



With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

Pole

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

original.Setting requirements: The landing door should be standardized and tooled.

Before installation, foundation bearing capacity embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side,SiroliElectric brick elevator, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation,SiroliSmall 100kg electric elevator, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.

A lifting platform with specifications ranging in height from 1 meter to 20 meters.

Monthly maintenance and inspection of hydraulic lifting platform rollers,SiroliElectric tricycle elevator, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, or has foreign objects such as gravel sticky, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

Siroli.Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movement

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.