The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.

The use of standard section connecting bolts should comply with the user manual and specification requirements.

Legnano.Lowering platform, vehicle mounted lifting platform, self-propelled lifting platform, diesel engine curved arm self-propelled lifting platform, folding arm lifting platform, cylinder sleeve lifting platform,LegnanoNiuli brand electric elevator, aluminum alloy lifting platform, and special

To ensure safe and reliable braking of the lifting platform and prevent accidents, a hydraulic control one-way valve, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.

.The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

Use floor doors and cage door devices on construction sites where conditions permit.

Use floor doors and cage door devices on construction sites where conditions permit.


LegnanoMobile electric hydraulic elevatorPrinciple of Direction



Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance,LegnanoElectric chain elevator, the protective measures taken should comply with the specification requirements.

Setting requirements: Steel wire rope electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the cage until it passes through the

Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength,LegnanoElectric lifting platform 2 meters, stability, etc., and the production should meet the design requirements.

Supply chain quality management.Setting requirements: The landing door should be standardized and tooled.

The safety distance between the outer edge of the upper part of the landing door and the moving parts of the electric elevator during normal operation should not be less than 0.75m; If the rated speed is not greater than 0.7m/s, it should be designed and calculated separately.


LegnanoMobile electric hydraulic elevatorPrinciple of Direction



Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Potential development.Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

Before use we should observe whether there is any damage to the electric elevator. We can conduct a no-load test to raise and lower it. If there are any damaged parts, they should be replaced in a timely manner to prevent major accidents.

Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

Legnano.Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case