peitaihoTwo phase electric elevatorPay attention to the shaping of brand awareness

announcer:hp935HP175192871 release time:2024-01-11 10:45:34

The verticality of the guide rail frame should meet the requirements of the specifications.

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

peitaiho.Construction electric elevators must be equipped with lifting cages and reusable buffers,peitaihoGuide rail electric elevator, and comply with regulatory requirements.

Flat screw mechanical electric lifting mechanism: The lifting platform of this structure has the advantages of small civil engineering coordination, shallow foundation pit required, large stroke, low noise, accurate positioning, and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table, it can be stopped arbitrarily within the range of travel.

.Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.

The counterweight guide rail should meet the specification requirements.

The pump body adopts an integrated pump station all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.


peitaihoTwo phase electric elevatorPay attention to the shaping of brand awareness



Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.

The counterweight steel wire rope should be equipped with an anti loosening device that is sensitive and reliable.

Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor), family dormitories, and

manufacturer.The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test, it worked normally.


peitaihoTwo phase electric elevatorPay attention to the shaping of brand awareness



There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

Design brand.The verticality of the guide rail frame should meet the requirements of the specifications.

The up travel (limit) switch should be of the automatic reset type.

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

peitaiho.Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective,peitaihoThree wheel electric elevator, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test, it worked normally.