ravenna Electric bed elevatorClick to view

announcer:hp935HP175192871 release time:2024-01-10 12:43:18

otherwise protective measures shall be taken.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver,ravenna Second floor electric elevator, the landing door shall not be opened.

ravenna .The pressure joint between the pipe joint and the rubber hose fails prematurely,ravenna Fully automatic elevator electric,ravenna Warehouse electric elevator, causing oil leakage or pipe explosion. The oil temperature rises due to frequent action of the overflow valve.

Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered down

.The L distance depends on the selected wall mount model.

High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.


ravenna Electric bed elevatorClick to view



When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

Try to use this equipment in areas with wind force less than level five, and avoid using it when the wind force is too strong to avoid accidents.

Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

Quality inspection report.The quality of the standard section should comply with the product manual and specification requirements.

Before operating the construction electric elevator, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.


ravenna Electric bed elevatorClick to view



Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

Promotion.Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

The use of fully autonomous electric elevators can create more benefits and ensure safety in all aspects.

The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

ravenna .Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.