Southern JiangsuApplication of oil immersed transformerInvestigation report on industry operation situation and investment prospects

announcer:hp122HP117294921 release time:2024-01-07 13:41:32

Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.

Plug in the power with full load first observe and detect that the input and output voltage meets the regulations. At the same time,Southern JiangsuThree phase transformer 380V to 208v, check whether the equipment has abnormal sound, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

Southern Jiangsu.Transformer

After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.

.For example,Southern JiangsuTemperature standard for oil immersed transformers, in the 1970s, the radio programs applied by every family in the countryside had a ground wire, and they were often wet with tap water. Protective grounding is to bury the copper plate of metal electrical conductor in the soil layer, and then lead a point of it out of the road with transmission line, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ 4Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.

Due to poor sealing, generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.

Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).


Southern JiangsuApplication of oil immersed transformerInvestigation report on industry operation situation and investment prospects



Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.

Transformer is

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.

resources.The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness,Southern JiangsuBox transformer 500, resistance to short-circuit faults, common faults and impact. The work is diligent.

Method and process of taking oil sample of power transformer

Oil immersed transformer


Southern JiangsuApplication of oil immersed transformerInvestigation report on industry operation situation and investment prospects



In terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;

Free consultation.The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

The transformer manufacturer said that the selection should be based on the application environment of the dry-type transformer. For the extremely extreme environment, the dry-type transformer should be poured with epoxy resin glue. Because this kind of environment does not need to heat the dry-type transformer, it can operate immediately. However, for the general application environment, the class H dry-type transformer can be used.

After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.

The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.

How to reduce the failure of dry-type transformer?