LangerodThree phase oil immersed regulatorAre there any requirements for the direction of enterprise development?

announcer:hp122HP117294921 release time:2024-01-01 09:27:27

Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, and the selected structures and connections are also different. Then, what are the groups of dry-type transformers? How to carry out the connection? Or basically introduce it with the network of dry-type transformer manufacturers.

Langerod.How to select dry-type transformer

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), or it can be replaced by changing the oil.

.The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω, The resistor is generally more than 2000 & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only 1 / 500 of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.

If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear 4 round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.

Method and process of taking oil sample of power transformer


LangerodThree phase oil immersed regulatorAre there any requirements for the direction of enterprise development?



It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.

The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing, remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil,LangerodDry type transformer brand,LangerodOil immersed distribution transformer, etc.

Connection group structure of dry-type transformer

production.For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

What is the wavelength of oil immersed transformer?

The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, but there are many calculation methods.


LangerodThree phase oil immersed regulatorAre there any requirements for the direction of enterprise development?



(IV) the transformer on the column shall be stable and firm and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

target.If the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.

Under normal conditions, different oil-based oils cannot be mixed. Under special circumstances, if it is necessary to use new oil of different grades, it should be determined whether the mixed oil with ice degree can be used according to the requirements of the region, and then the oil mixing test should be carried out.

When the transformer is put into operation, if the tap changer is not in time a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound,LangerodDry type transformer setting requirements, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation power off immediately for maintenance.

Langerod.The manufacturing process of dry-type transformer is very process, and must be technically as a certain pillar. Only in that way, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?

Note: in the whole process of safety patrol inspection the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.

In specific daily life, we have a certain understanding of the optical wavelength of oil immersed transformer. What kind of function does it have for transformer?