TabrizS13 oil immersed transformerCorrect maintenance application

announcer:hp122HP117294921 release time:2023-12-31 10:02:41

TabrizHow much is 1250kva box transformer,

The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.

Dry type transformer company

Tabriz.The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment, such as discoloration, offset, cracking, loosening, ignition smoke, oil leakage, broken strand disconnection, short-circuit fault marks, hanging of dirty things, etching and turbidity, which can be inspected according to the visual inspection method. Therefore visual inspection is one of the common methods of equipment inspection.

The key reason for oil leakage is that there are defects in cast iron parts

.Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.

Wiring mode of dry-type transformer:

Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.


TabrizS13 oil immersed transformerCorrect maintenance application



The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.

It should be said that after the development trend of these years, the overall level of China's transformer industry at this stage is basically international and the quality level is no different from that of overseas goods& rdquo; The person in charge of the transformer Federation of China Household Appliance Industry Association said.

Before no-load impulse closing, the transformer shall be placed for 24h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

Analysis project.When sampling in bulk gasoline barrels, but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to 2% of the total number of barrels (bottles).

Power transformer manufacturer

The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; 0” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.


TabrizS13 oil immersed transformerCorrect maintenance application



The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.

Test results.During no-load test run,TabrizDry type transformer protection configuration, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.

When the operating oil is mixed with different types of new oil or used for oil, in addition to the accurate measurement of the cold filter point of the mixed oil, it is also necessary to carry out high and low temperature test and sludge test, and observe the sludge accumulation. The accumulation cannot be accessed. The results of the operation of the mixing template are not that the original oil is very poor, so it can be managed and used in a mixed manner.

After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.

Tabriz.Power transformers are used in all walks of life

For no-load impulse closing of transformer, pay attention to the following matters:

The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance,TabrizModel of oil immersed transformer, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.