ironForklift mobile boarding bridgeHow to choose water-based paint

announcer:hp258HP138990173 release time:2023-12-29 10:27:18

  2. The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure. During construction, the factors of loading and unloading operations were not taken into account. The platform type loading and unloading bridge serves as a remedial solution and can also meet the requirements for loading and unloading operations into truck carriages. The platform type boarding bridge is also designed in various structural forms according to different on-site conditions. It can also be adjusted up (below the cargo platform) or down (below the cargo platform) within a certain range, which can meet the installation and use of most loading and unloading platforms.

The following is a brief introduction to the storage of hydraulic oil in fixed hydraulic boarding bridges for a wide range of users: when stopping the hydraulic oil drum and filling, it is necessary to achieve three passes and pass when receiving oil; Filtering during barrel rotation: When refueling the equipment, it is too cold to ensure the cleanliness of the bucket mouth, oil injection port, oil barrel, etc., to prevent impurities from entering the oil port and forming hydraulic oil purification.

iron.Insufficient understanding of the operating conditions of the axle. Assuming you understand some fundamental principles and the three elements that lead to success, you can ensure that you are in excellent working form for a long time. Inspection before use of mobile boarding bridge: Check if the oil unloading valve is tightened. Use of mobile boarding bridge: Use a hand pump to raise the boarding bridge to the required position and height; Place the tongue plate on the box and connect the safety chain to the box; Place the wheel mask in a suitable position next to the tire; Release the manual oil unloading valve to make the oil cylinder and wheels in a natural state, making them in a relaxed state; After the above preparations are completed, refers to the boarding bridge embedded in the loading and unloading operation platform. The installed boarding bridge main board surface is horizontal with the upper plane of the loading and unloading operation platform. Completely integrated into the platform as the name suggests, it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings.

.Anti collision block: This device can effectively protect buildings and boarding bridges from damage. It is made of highly resistant reinforced rubber. The four outer corners of the anti-collision block are all arc-shaped and all bolt holes are deeply embedded inside. Bolt hole size is Ф 2. Anchor bolt structure for M20 assembly: The fixed boarding bridge is composed of mechanical system, hydraulic system, and electrical system. The platform and chassis form a mechanical system. Platform with& quot; U& quot; Shaped steel as the skeleton, with light self weight and large bearing capacity; The countertop is made of anti slip patterned steel plates and has a high load-bearing capacity; The countertop is made of anti slip patterned steel plates, and can withstand a speed of 10 kilometers/hour when the forklift is fully loaded without bending, improving work reliability. Professional Tideng Axle Factory quality assurance. Discount activities are underway, welcome new and old customers to come for consultation

The fixed hydraulic boarding bridge has three fundamental elements: purification, overheating, and air intake. There is a close internal connection between these three unfavorable factors, and any one of them will result in one or more achievements. Theoretical proof shows that 75% of the reasons for fixed hydraulic boarding bridges are caused by these three factors.

Function: Convenient unloading, strong stability, and low maintenance cost. Suitable for various vehicles on loading and unloading sites and places with relatively busy traffic. Loading and unloading platforms, lifting platforms, and unloading platforms: anti slip device: This device is welded from steel plates, which can effectively achieve anti slip function and is safe and reliable.


ironForklift mobile boarding bridgeHow to choose water-based paint



Firstly, before using the equipment (shè bè i), it is necessary to check whether there is water accumulation in the points, and then confirm whether the fasteners are damaged or loose. If a fault is detected, necessary repairs and replacements need to be carried out. Check all control devices (zhu ā ng zhì) Whether the operation is normal, whether the switch and governor are in good condition, whether the movement and working speed are stable, and whether the display is normal

The instrument equipment instrument inspection (inspection and testing) method utilizes various instruments to measure the hydraulic system, hydraulic components' performance (xì ng né ng), parameters, and analyze and process these data (ch ǔ l ǐ) To determine the location of the fault. A mature lifting platform manufacturer in China, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Only one person is required to operate without the need for power supply, which can achieve safe and fast loading and unloading of goods.

Information recommendation.Equipment environment, fixed hydraulic boarding bridge itself application requirements, selecting appropriate equipment, can achieve very good application effect. It is a specialized auxiliary equipment for completing the rapid loading and unloading of goods. Horizontal load problems are often encountered in mobile lifting channels and vehicular lifting channels. How do we understand the additional load on fixed hydraulic boarding bridges? The additional load refers to the load that the lifting channel is subjected to under normal operating conditions under non recurring actions.

  3. Mobile boarding bridges are used in places where there is no loading and unloading platform on site or where mobile loading and unloading of goods is required. If there is no loading and unloading platform at the logistics site, as a remedial measure a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Only one person is required to operate without the need for power supply, which can achieve safe and fast loading and unloading of goods.

Precautions for safe use of fixed hydraulic boarding bridges When operating the machine, it is necessary to operate it in a safe manner. Unfamiliar personnel should not do so. During the operation do not stand bystanders around. Be sure to carry the load according to the rated load, and do not overload or deviate. The rated load of the fixed hydraulic boarding bridge specified by the manufacturer is the total weight of the loaded goods and forklifts, not the weight of the goods alone. This is something that customers and friends should know. If there is detachment or deformation of the boarding bridge, please do not use it to avoid serious accidents. The boarding bridge is mainly an auxiliary device for loading and unloading goods, and is something that logistics companies (Company) cannot do less. If the power of the boarding bridge operation (zuò yì) is to be durable, no problems can appear during the operation. Perhaps the problems can be dealt with in a timely manner. Regarding identifying the cause of the hydraulic system problem of the boarding bridge, It is beneficial for us to use the boarding bridge correctly and provide homework


ironForklift mobile boarding bridgeHow to choose water-based paint



Using a hand operated hydraulic pump as power, the height adjustment of the boarding bridge can be achieved without the need for external power supply.

plan.Adopting anti slip patterned steel plates, the platform has good anti slip performance.

When using the boarding bridge for loading and unloading, and do not be overweight. If overweight occurs, it will make the hydraulic system struggle during the lifting process,ironMobile forklift boarding bridge, and even cause deformation of the hydraulic cylinder body, resulting in gaps and oil leakage outward. This requires finding a professional manufacturer for maintenance, such as Shanghai Niuli Machinery. If the deformation is severe, the only option is to replace it with a new one.

Precautions for safe use of fixed hydraulic boarding bridges When operating the machine,ironMobile boarding axle hydraulic pressure, it is necessary to operate it in a safe manner. Unfamiliar personnel should not do so. During the operation, do not stand bystanders around. Be sure to carry the load according to the rated load, and do not overload or deviate. The rated load of the fixed hydraulic boarding bridge specified by the manufacturer is the total weight of the loaded goods and forklifts, not the weight of the goods alone. This is something that customers and friends should know. If there is detachment or deformation of the boarding bridge, please do not use it to avoid serious accidents. The boarding bridge is mainly an auxiliary device for loading and unloading goods, which greatly improves the loading and unloading power (referring to the amount of work done by objects in a unit of time),ironBoarding bridge type boarding bridge, and is something that logistics companies (Company) cannot do less. If the power of the boarding bridge operation (zuò yì) is to be durable, no problems can appear during the operation. Perhaps the problems can be dealt with in a timely manner. Regarding identifying the cause of the hydraulic system problem of the boarding bridge It is beneficial for us to use the boarding bridge correctly and provide homework

iron.Firstly, before using the equipment (shè bè i), it is necessary to check whether there is water accumulation in the points, and then confirm whether the fasteners are damaged or loose. If a fault is detected, whether the switch and governor are in good condition, whether the movement and working speed are stable, and whether the display is normal

Adopting imported integrated modular hydraulic station with good sealing performance and long service life.

Adopting anti slip patterned steel plates, the platform has good anti slip performance.