Lorient Guide rail chain type lifting cargo elevatorWhat are the main control systems described

announcer:hp779HP136589660 release time:2023-12-27 10:48:37

When a cargo elevator fails, it should be repaired by professional personnel. It is not allowed to modify the cargo elevator without permission.

The elevator is a kind of elevator equipment composed of a walking mechanism, a hydraulic mechanism, an electric mechanism, and a support mechanism. The hydraulic oil forms a certain pressure by a vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, flameproof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve. This allows the hydraulic cylinder to move upward and lift heavy objects. The return oil from the upper end of the hydraulic cylinder returns to the tank through the flameproof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. Observe the reading value of the pressure gauge on the pressure gauge.

Lorient .Brief Discussion on Daily Maintenance and Use of Hydraulic Lifting Platform Motor Overloading is strictly prohibited. Overloading can increase the burden on the motor, and in severe cases, can cause the motor to burn out.

It is good for aerial work vehicles not to cover their clothes and park outside. If it is windy and rainy, especially if the vehicle blows sand on the clothes, causing many fine scratches on them, as the paint will become black over time. In addition, it should be washed with water, and prevent the vacuum cleaner of the aerial work vehicle from scratching the sand particles on the paint surface.

.Hydraulic pump station: domestic lifting platform dedicated pump station, Italian imported pump station with external protective devices: organ m type,Lorient 4-ton hydraulic lifting cargo elevator, mesh type, and iron plate sealed type.

The cleanliness of the hydraulic station is an important aspect of the elevator hydraulic station, so it should not be taken lightly. Moreover, from a professional perspective, there are relevant rules and requirements. You should refer to the specification manual, so that you can have a correct understanding and know how to achieve better cleanliness.

To ensure excellent power supply at the installation site, install a separate distribution box. When using the distribution box, the electrical leakage switch must meet the requirements for construction elevators. If the installed construction elevator is variable frequency, the selection of the leakage switch should be compatible with the frequency converter.


Lorient Guide rail chain type lifting cargo elevatorWhat are the main control systems described



'Using the elevator is not about maintaining and overhauling the equipment after it has failed. It is important to maintain the equipment in accordance with the correct maintenance and overhaul. First, do the preparatory work to eliminate all possible fault problems and accidents. I hope that today's summary of knowledge points by the editor can help everyone.'.

If the hydraulic valve is damaged its effectiveness should be maintained. If it is damaged, it can be replaced in a timely manner.

The brake operators of each mechanism on the equipment should regularly check and adjust the clearance of the brake shoe and brake wheel, a 20 year old brand with competitive prices and guaranteed quality!

The cheapest.Carefully prepare a special construction plan for installation and construction, and provide safety technical disclosure to installation personnel.

Test the goods elevator every day to see if it can operate normally.

What is the new price of fixed elevators? Fixed elevators are currently very popular in the market. Due to different manufacturers, different materials,Lorient A cargo elevator needs to, different load ratings, and different brand awareness, the prices also vary. Currently the prices of fixed elevators produced in the domestic market are: rated load 1-5 tons, lifting height 7 meters table size 2500 mm * 2000 mm, and the price is around 27000-45000 yuan; The rated load is 1-3 tons, the lifting height is 0 meters, the table size is 2300 mm * 2000 mm, and the price is around yuan. Rated load and lifting height of each fixed elevator,


Lorient Guide rail chain type lifting cargo elevatorWhat are the main control systems described



Several types: motor winding open circuit. When one phase of the motor winding is open circuit, or one of the parallel branches is open circuit, it will cause three-phase current imbalance and cause the motor to overheat.

install.Test the goods elevator every day to see if it can operate normally.

The one-way valve is damaged. The one-way valve is designed to prevent oil return. If there is a problem, there will be some backflow, protective barriers are generally added to the platform. As lifting platforms belong to special equipment, the National Quality Inspection Bureau strictly inspects this area. Any lifting platforms that are deemed to have safety hazards must be removed. Therefore, when personnel ask if you need to add guardrails, do not blindly refuse, and consider whether it is necessary based on the site of use. 'In addition, it is necessary to possess two types of certificates, namely, the Special Equipment Manufacturing License of the People's Republic of China and the Special Equipment Installation, Transformation, and Maintenance License of the People's Republic of China, before production,Lorient Guide rail type cargo elevator cargo elevator, installation, and maintenance can be conducted. Therefore, it is necessary to ask the manufacturer whether they possess these two types of certificates.'.

Lorient .The purpose of hydraulic lifting platform Users can choose the power mode and configuration according to their own scope of use: power systems include: DC power supply, single-phase or three-phase power supply, diesel engine.

Prepare the foundation according to the foundation plan, pay attention to alignment, leveling and alignment, and ensure the level of the foundation and various usage requirements.

Incorrect connection of the elevator motor When a coil, coil group, or one phase winding group is connected inversely, it can cause a serious imbalance in the three-phase current and cause the winding to overheat.