BinaOutline dimensions of 2500kVA dry type transformerRequirements in the modern automobile industry

announcer:hp122HP117294921 release time:2023-12-26 09:12:43

In specific daily life, oil immersed transformers are released outward in the form of waves. This kind of wave is like a tide. It is also a kind of kinetic energy. In fact, the wave height of oil immersed transformer also shows the size of kinetic energy. Generally, computer automatic system is used to control the wavelength and frequency of electromagnetic wave. The longer the light wavelength is the greater the output power is. On the contrary, it is very small.

Brief introduction of zero line of power transformer

Bina.What is the cause of power transformer core failure?

Dry type transformer factory

.When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.

The project cost is different. Compared with the purchase price of capacity transformer the purchase price of dry-type transformer is much higher than that of oil immersed transformer.

The method and whole process of taking oil sample of power transformer are as follows:


BinaOutline dimensions of 2500kVA dry type transformerRequirements in the modern automobile industry



Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.

Hand touch method for transformer inspection

Equipped with a temperature controller, platinum thermistor (pt10) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.

Quality improvement.The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil,BinaBox type transformer room, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.

Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined,BinaFire resistance rating of oil immersed power transformer room, and then Fushi blue raw materials shall be selected for sealing treatment.

Analysis of common faults of oil immersed transformer:


BinaOutline dimensions of 2500kVA dry type transformerRequirements in the modern automobile industry



The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.

Quality Assurance.What is the reason for the shutdown of power transformer?

With Vietnam and Malaysia, China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.

Sound in case of phase failure

Bina.When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.

When sampling in bulk gasoline barrels, samples shall be selected according to 5% of the number of gasoline barrels, but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to 2% of the total number of barrels (bottles).

Brief introduction of zero line of power transformer