DunkirkElectric hydraulic elevatorHow to control the switch of the sealing and shrinking packaging machine

announcer:hp935HP175192871 release time:2023-12-26 09:07:58

In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between 1m and 2m. And there should be at least protective railings, a half height middle crossbar and a toe board at least 150mm above the ground.

During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

Dunkirk.When adding hydraulic oil, it is also necessary to pay attention to the structure of the oil cylinder. Some oil cylinders are relatively complex internally, and how many lifting operations need to be carried out during filling to fully fill each position of the hydraulic oil. Therefore, when filling, try to add as much as possible, and then test and run the machine empty to see if it reaches the rated position.

When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.

.Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm,DunkirkElectric tatami elevator, and the top layer is not affected. It can be customized according to the location and environment.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).


DunkirkElectric hydraulic elevatorHow to control the switch of the sealing and shrinking packaging machine



Protective measures should comply with regulatory requirements.

. The shutdown device (emergency stop switch) should be installed outside the ground protective fence; b) Pulley room (if any. Pulley room refers to a room where only pulleys or speed limiters and electrical equipment are installed; c) hanging cage top, if

Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

Quality inspection report.The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening,DunkirkElectric elevator mobile type, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position


DunkirkElectric hydraulic elevatorHow to control the switch of the sealing and shrinking packaging machine



The function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically,Dunkirk2 ton electric elevator, the lifting platform, side car platform, and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.

build.Buffer. In order to increase the energy for the car to hit the top or sink to the bottom. Remove rubber or sponge from the buffer and cabin to increase their impact energy; Rope groove slipping and other accidents caused the car to suddenly fall, resulting in a safety clamp. To prevent breakage of the lifting wire rope. A safety clamp that can simultaneously cut off the power supply and stop the car from falling should be removed from the car. A car without safety tongs is not allowed to ride or carry people. If it is a simple electric elevator, there should be a safety device (such as a safety stop pin) to prevent people from suddenly falling when loading and unloading goods in the car; Electric elevators with three or more floors (including three floors) for passengers or passengers.

The movement of its related components is direct.

The counterweight guide rail should meet the specification requirements.

Dunkirk.During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

Horizontal lead screw mechanical electricity

Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.