PesaroElectric tricycle hydraulic elevatorOverall market volume

announcer:hp935HP175192871 release time:2023-12-20 11:08:34

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit,PesaroSmall electric hydraulic elevator, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Mechanical devices controlled by cage movement should not be used to open or close the landing door.

Pesaro.Setting requirements: A limit switch should be set at both the upper and lower ends of the stroke, which should be able to cut off the power supply before the suspension cage and other mechanical stop devices (such as buffers), so that the suspension cage can stop

Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, personnel and property losses.

.In order to meet the needs of contemporary audiences and achieve perfect effects, in addition to lighting and sound, stage machinery is particularly important on the stage. On the stage, there are suspension rods, suspension points, lighting bridges, lighting suspension cages and fire curtains. Under the stage, there are lifting platforms, car platforms, turntables, and lifting orchestras. Some lifting platforms are equipped with turntables, or there are lifting platforms in the turntables. Various types of lifting platforms are equipped in professional opera houses, dance theaters, drama theaters,PesaroElevator electric 6 meters, and many internationally renowned music halls. It has the functions of quickly changing scenery, meeting the needs of stage craft layout, creating special atmosphere and effects, and changing the stage form according to the needs of the performance.

The function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically, with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern, the lifting platform, side car platform, and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.

The L distance depends on the selected wall mount model.


PesaroElectric tricycle hydraulic elevatorOverall market volume



Stage equipment safety door. To prevent personnel from extending their heads, hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

Folding arm electric elevators are mostly driven by hydraulic means, and the source of power for the hydraulic system is hydraulic oil. Only when the hydraulic oil quantity is sufficient and the oil quality is high, can the folding arm electric elevator provide greater torque output, thereby improving work efficiency. So, how can we determine whether the newly added hydraulic oil quantity is sufficient? What is the hydraulic oil quantity standard?

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

Excellent quality.The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.

The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.

During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.


PesaroElectric tricycle hydraulic elevatorOverall market volume



Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

new product.In order to meet the needs of contemporary audiences and achieve perfect effects, in addition to lighting and sound, stage machinery is particularly important on the stage. On the stage, there are suspension rods, suspension points, lighting bridges lighting suspension cages, and fire curtains. Under the stage, there are lifting platforms, turntables, and lifting orchestras. Some lifting platforms are equipped with turntables, or there are lifting platforms in the turntables. Various types of lifting platforms are equipped in professional opera houses, dance theaters, drama theaters, and many internationally renowned music halls. It has the functions of quickly changing scenery, meeting the needs of stage craft layout, meeting the needs of stage design and choreographers, and changing the stage form according to the needs of the performance.

And the decoration team is also using aluminum alloy electric elevators. What safety considerations should we consider during the use process? Many manufacturers have not clearly indicated it. Today, the mechanical editor will talk to you about aluminum alloys

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

Pesaro.Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure,PesaroElectric elevators for construction sites, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.

The net height of the landing door opening should not be less than 8m, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed 35mm, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts