BalanchaS11 technical parameters of power transformerWhat are the contents of the test

announcer:hp122HP117294921 release time:2023-12-20 10:23:10

Then clamp the branch pipe with your thumb, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

Balancha.The transformer manufacturer shall not use hand touch method to detect energized high-voltage equipment, such as transformer in operation and neutral grounding equipment of arc suppression coil. For the equipment without power supply and whose shell is reliable grounding device, the temperature or temperature rise must be tested by hand. The secondary equipment can be inspected by hand touch method when it is hot and vibrated.

Seal oil leakage

.For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

Dry type transformer

In specific daily life, we have a certain understanding of the optical wavelength of oil immersed transformer. What kind of function does it have for transformer?


BalanchaS11 technical parameters of power transformerWhat are the contents of the test



In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment,BalanchaPrinciple of power transformer, such as discoloration, deformation, offset, cracking, loosening, ignition smoke, oil leakage, broken strand disconnection, short-circuit fault marks, hanging of dirty things, which can be inspected according to the visual inspection method. Therefore, visual inspection is one of the common methods of equipment inspection.

After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.

production costs.In terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle,BalanchaTechnical parameters of 10kV oil immersed transformer, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration,BalanchaInstallation scheme of 35 kV oil immersed transformer, the bottle cap shall be tightly closed and cannot be opened before application.

In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.


BalanchaS11 technical parameters of power transformerWhat are the contents of the test



The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults, common faults and impact. The work is diligent.

Quality inspection report.When checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken, if you work again, turn on the photo flash when it's light, and it's short when it's heavy. Therefore, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance, experts can inspect special tools, parts insulation, etc. and deliver them after they are determined to be complete and reliable.

The grounding resistance of, high voltage and bottom voltage shall not be less than 70% (10m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed 2%, which shall not exceed 2% compared with the last accurate measurement result.

During no-load test run the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.

Balancha.The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.

The whole process of hanging the core of dry-type transformer is more critical and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!