CoronellS13-m-200 power transformerThe solution to the compression problem

announcer:hp122HP117294921 release time:2023-12-19 11:28:49

it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

Coronell.How to maintain dry-type transformer?

After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.

.When the screw of the through core extruder holding the iron core of the transformer is loose, there are screw cap parts left on the iron core or small metal materials fall into the transformer,CoronellPower transformer insulating oil test, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak, squeak & rdquo; It's like a magnet sucking a small washer, while the working voltage, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer, and can be solved until power failure.

Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

Power transformer


CoronellS13-m-200 power transformerThe solution to the compression problem



Oil leakage of porcelain pot and laminated glass oil level gauge

The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment, deformation, offset, cracking, loosening, ignition smoke,CoronellType of dry-type transformer, oil leakage, short-circuit fault marks, hanging of dirty things, etching and turbidity, which can be inspected according to the visual inspection method. Therefore, visual inspection is one of the common methods of equipment inspection.

The hanging core of dry-type transformer is a vital part

market.Dry type transformer factory

In the case of using dry-type transformer, customers must master the method of wiring. If there are problems in wiring, it is easy to cause common faults in application. So, what is the wiring mode of dry-type transformer?

The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.


CoronellS13-m-200 power transformerThe solution to the compression problem



Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil insulated by insulating oil in the circulating system inside the transformer, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.

build.(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

Power transformer is indispensable for power stations and substations, but we must pay attention to many problems in the whole process of applying power transformer.

In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuit

Coronell.The voltage regulating tap changer is not in place or poor

When the new oil filled by the power transformer and the oil sample that has just been considered are used,CoronellRated current of 1600KVA box transformer, the oil sample can be used only after sufficient standing.

Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.