FenyangElectric single arm elevatorTurn a loss into a profit

announcer:hp935HP175192871 release time:2023-12-15 11:26:00

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

Fenyang.The isolation and buffering rubber in various parts of the aluminum alloy electric elevator drive device are intact and tightly fitted.

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

.Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space,FenyangElectric hydraulic elevator, and ensure that the lifting platform can be lifted to the rated lifting height.

Implementing multiple shifts of homework should fill in and submit records according to regulations.

The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.


FenyangElectric single arm elevatorTurn a loss into a profit



Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

Aluminum alloy lifting platforms can be divided into single column aluminum alloy, cargo elevator, double column aluminum alloy, three column and four column aluminum alloy. Can be used in factories automated warehouses, parking lots, municipal facilities, buildings, and installations

Horizontal lead screw mechanical electricity

Quality assurance.Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

The scaffolding of the parking platform should be laid tightly and firmly.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.


FenyangElectric single arm elevatorTurn a loss into a profit



Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

total cost.Spiral electric lifting mechanism: With all the functions of a regular lifting platform, and the top floor height can be installed at least 2.5 meters.

Fenyang.With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

The landing door should meet the requirements of the specifications and achieve standardization.

Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform,FenyangSmall electric screw elevator, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.