Busgow FreiburgFully self-propelled electric elevatorHypoallergenic

announcer:hp935HP175192871 release time:2023-12-15 09:10:00

Setting requirements: Before starting work every day and changing shifts,Busgow FreiburgElectric wire rope elevator, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.

The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.

Busgow Freiburg.The water cooling of hydraulic stations is generally tubular water cooling. The selection is based on the heat load to calculate the heat exchange area, while the air-cooled electric elevator uses an air cooler to calculate the heat exchange capacity based on the heat load. Then, the selection calculation is carried out under the condition of satisfying the flow rate. So, these two types of cooling are different and have significant differences.

Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

.The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

The entrance of each landing platform must be equipped with a landing door,Busgow FreiburgElectric brick elevator on construction site, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.


Busgow FreiburgFully self-propelled electric elevatorHypoallergenic



The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

Construction electric elevators should be equipped with emergency stop switches and comply with regulatory requirements.

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.

Fair price.When the landing door is closed, strength it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, stability, and the production should meet the design requirements.


Busgow FreiburgFully self-propelled electric elevatorHypoallergenic



Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

Excellent service.From the perspective of the safety performance of the machinery itself, those that have undergone national safety certification will not have significant safety issues. The main problem is that after using the electric elevator for a period of time, mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery

The water cooling of hydraulic stations is generally tubular water cooling. The selection is based on the heat load to calculate the heat exchange area, while the air-cooled electric elevator uses an air cooler to calculate the heat exchange capacity based on the heat load. Then, the selection calculation is carried out under the condition of satisfying the flow rate. So, these two types of cooling are different and have significant differences.

Spiral electric lifting mechanism: With all the functions of a regular lifting platform the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

Busgow Freiburg.Setting requirements: The wall bracket should use the manufacturer's matching standard products.

Advantages of electric elevator rotary valve: Simplify the installation of electric elevator pipelines; The operation is more convenient, and the valve can be opened and closed at any time; The installation of a rotary valve reduces the friction of the sealing components; Compact structure, small size and space saving; Increased the service life of electric elevator pipelines and solved the problem of easy oil leakage.

To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers,Busgow FreiburgBackground axis electric elevator, in order to adapt to the requirements of the plot for the scenery or venue, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, a better highlighting effect can be achieved in various performances. According to the needs of the plot, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea, using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.