SalbrookSelf walking scissor fork lifting platformThe funding rate is still high

announcer:hp275HP127226562 release time:2023-12-06 09:11:03

Emergency descent: Handle operation or use of manual pressure relief and activation of emergency battery system to implement emergency descent function safety net.

The arrangement of vibration points should be based on the vibration aging process standard GB/T25712-20. The vibration aging exciter should be placed at a position with high rigidity and amplitude of the workpiece, and its rotating axis should be parallel to the plane where the effective zone of the vibration mode is located. The exciter should be fixed at the end angle or edge of the workpiece with high rigidity, so that small energy can be used to excite the component with large amplitude. Based on the structural shape of the foundation, we set the vibration points on the protruding plates on each side of the workpiece.

Salbrook.The wear rate is fast, and due to factors such as processing, assembly, and adjustment of new machine components the friction surface is rough, and the surface pressure condition is uneven. During the operation of the machine, the concave and convex parts on the surface of the parts are intertwined and rubbed against each other. The metal debris that falls off from the grinding process, in turn, further accelerating the wear of the mating surface of the parts. Therefore, during the running-in period, it is easy to cause wear on components (especially the mating surface), with a fast wear rate. At this point, if overloaded, it may cause damage to the components and lead to early failures.

Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat

.Emergency stop: Press the emergency button switch to raise or lower the machine.

Folding arm lifting platform product features 01 Folding arm lifting platform High altitude operation platform 360 degree rotation without external power supply, can work across obstacles, lifting smoothly and safely. The curved arm lifting platform adopts a curved arm working arm, and the scope and space of operation are not affected.

Outdoor guide rail lifting platform, mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and an elevation of 1-25 meters, guide rail elevators also known as hydraulic elevators, can be installed indoors and outdoors. They have a high lifting height and use side mounted oil cylinders, ensuring smooth operation, convenient maintenance, and long service life. In case of power failure, manual emergency descent can be used, which is safe, convenient, fast, and practical. The pit depth is generally 15cm-30cm. Professional elevator manufacturers have high pressure resistance, good waterproof performance, and fire and high temperature resistance, Strong overload capacity, corrosion resistance radiation resistance, long service life. The top layer height is not affected, and can be customized according to the on-site environment. It is suitable for 2-3 story steel structures or concrete factories, and can be used both internally and externally.


SalbrookSelf walking scissor fork lifting platformThe funding rate is still high



Outbound call form: Outbound call boxes are pre embedded or installed in a column style on the wall or ground near the parking floor above and below the platform, and are linked to operate the platform up and down.

Regularly check all wires and cables for damage. Timely bandage and replace damaged parts.

Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.

Management Department.Power supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.

The selection of vibration pickup points refers to the placement point of the sensor, which is used to measure the vibration amplitude of the workpiece. According to GB/T25712-2010, the acceleration sensor should be placed on the workpiece with a certain rigidity and a large amplitude, and its testing direction should be adjusted to be perpendicular to the plane where the effective zone of the vibration mode is located. Considering the complex structure of the lifting foundation workpiece and the uneven thickness of each component, the vibration pickup point is set in a thick area in the middle of the component.

Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat


SalbrookSelf walking scissor fork lifting platformThe funding rate is still high



The vibration frequency should be set to obtain large dynamic stress with low energy consumption, and the resonance frequency should be used to handle time dependent vibration. However, there may be one or more resonance peaks in large components, and using resonance peaks with higher peaks and lower frequencies for aging can achieve optimal results. The resonance frequency needs to be determined by trial vibration, which slowly increases the speed of the excitation motor from 0, and determines the relationship curve between the amplitude of the workpiece and the motor speed to determine the resonance point of the workpiece. According to the scanning curve, so 5366r/min was determined as the aging frequency.

original.Thermal aging stress relief is generally suitable for small workpieces, while the lifting foundation structure has a large volume and does not have a large enough annealing furnace. Using natural aging takes one year and the production cycle is too long, so neither of these two methods is feasible. After research and understanding by the manufacturer,SalbrookMast type aluminum alloy hydraulic lifting platform, it was found that selecting appropriate support points for large welded structural components can perform vibration aging stress relief. Therefore, the manufacturer has decided to use vibration aging for stress relief of the platform lifting foundation. Long term promotion of downgrading manufacturers, 20 year old brand, with price advantages and guaranteed quality!

Monthly maintenance: View weekly inspection items

Outdoor guide rail lifting platform, mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and an elevation of 1-25 meters, guide rail elevators, also known as hydraulic elevators, can be installed indoors and outdoors. They have a high lifting height and use side mounted oil cylinders, ensuring smooth operation, low noise, convenient maintenance, and long service life. In case of power failure, manual emergency descent can be used, convenient, fast, and practical. The pit depth is generally 15cm-30cm. Professional elevator manufacturers have high pressure resistance, good waterproof performance, and fire and high temperature resistance, Strong overload capacity, corrosion resistance radiation resistance, long service life. The top layer height is not affected and can be customized according to the on-site environment. It is suitable for 2-3 story steel structures or concrete factories, and can be used both internally and externally.

Salbrook.Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat

During aging treatment, the equipment prints the vibration aging curve online. According to the curve, the front end of the a-t curve shows an upward trend, indicating that the damping inside the component decreases after vibration treatment, so the amplitude gradually increases; Since then, the amplitude change has been basically stable, indicating that the structure of molecules inside the component tends to be stable, which conforms to the judgment standard of curve observation strip, thus it can be determined that the workpiece has reached the effect. The precautions for using an electric lifting platform are as follows: the user unit should arrange a dedicated person to operate the lifting platform and develop details and safety precautions for the use of the lifting platform based on their own unit's situation, and hang it in a prominent position. When working on an electric lifting platform, professional drivers and operators must be equipped, and they must undergo specialized training and be qualified. They must hold relevant certificates and take on corresponding responsibilities according to the actual situation of the work. After the construction is completed, the lifting platform needs to be moved on the site and should be operated by a professional driver. Before daily work, zy12 drivers must carefully check the electrical, hydraulic, and mechanical systems of the platform, check the working range of the lifting platform truck, and remove obstacles that hinder the rotation and walking of the lifting platform truck. And empty the platform up and down several times to check for any faults or abnormal phenomena. It is also necessary to pay attention to the accuracy of the platform platform landing station for any obvious abnormal differences. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultation

Power supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.