What about oil immersed transformer fire?

The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, common faults and impact. The work is diligent.

Katadarenia.Power saving analysis of transformer

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh,KatadareniaStandard for AC withstand voltage test of power transformer,KatadareniaDimensions of 1600KVA oil immersed transformer, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

.The switching power supply lacks one phase of power;

The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

(IV) the transformer on the column shall be stable and firm and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.


KatadareniaMaximum allowable temperature of oil immersed transformerSmall price fluctuations



Sound in case of phase failure

Transformer

Deterioration damage of transformer core insulation

Development Curriculum.The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω, According to Ohm's law The resistor is generally more than 2000 & omega;, when the insulating layer is damaged, the current is only 1 / 500 of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, which is stacked at the 45 degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.

Power transformer plant


KatadareniaMaximum allowable temperature of oil immersed transformerSmall price fluctuations



Oil immersed transformer operation

Inspection requirements.The switching power supply lacks one phase of power;

The cycle time of power-off cleaning and inspection shall be determined according to the surrounding environment and load conditions, generally from half a year to once a year;

The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!

Katadarenia.(I) the distance between the external contour of 10kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than 1m; At the angle with actual operation, a spacing of more than 2m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.

After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

Operation and maintenance management of oil immersed transformer