Queiruz25kV power transformerEnergy-generating role

announcer:hp122HP117294921 release time:2023-11-30 11:46:40

Oil leakage at electric welding position

Careless maintenance and insulation damage

Queiruz.Precautions for trial operation of power transformer manufacturers

Oil immersed transformer

.The insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged, the iron core causes large vortex, resulting in heat, temperature rise, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.

The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

Oil leakage of cast iron parts


Queiruz25kV power transformerEnergy-generating role



For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents power failure, damage to machinery and equipment,QueiruzHow much is a box transformer, etc.

In order to better avoid overvoltage damage a group of overvoltage maintenance high-voltage Arresters (such as y4cs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.

Oil leakage of heat pipe radiator

build.A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable,QueiruzOperating temperature of oil immersed transformer, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.

For no-load impulse closing of transformer, pay attention to the following matters:

Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.


Queiruz25kV power transformerEnergy-generating role



The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

Excellent quality.The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.

Dry type transformer, a static electrical equipment, is used to change the AC current (current) of a certain standard value into another or several types of working voltage (current) with the same frequency and different standard values. According to the supervision sampling inspection data of the third quarter of last year released by AQSIQ, among the 29 kinds of dry-type transformer commodities manufactured by 29 manufacturers in 12 provinces and municipal districts across the country, 6 kinds of commodities were found to be inconsistent with the provisions of relevant specifications, with a compliance rate of 80%& ldquo; This result mostly shows the quality level of China's dry-type transformer industry at the present stage.

A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.

Queiruz.When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, and loosen your thumb to make the oil enter the pipe,

(5) the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut),QueiruzBox type distribution transformer, wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.