Secondly, timely inspection of various functions is essential.

Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor) it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level which is an individual mechanism that is integrated with a safety clamp; The entrance and exit of the passenger compartment should be equipped with safety doors. Public places, family dormitories, and

Heidelberg.How to determine the sufficient amount of clean oil for the hydraulic station of an electric elevator? Why cannot water be used to flush the hydraulic station of an electric elevator?

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

.Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

Braking. The brake limit switch for partial motion control of the electric hoist traction machine. Assembly that restricts the operation of the lift car when it is opened to a high or low position; If the limit switch controls the overtravel switch. When the car travels to a high or low position, it will take on the function of raising or lowering. In order to prevent the lift car from crashing or sinking, stage equipment should be dismantled with over travel switches that can cut off power and cannot be automatically reset,HeidelbergFully electric self-propelled elevator, and installed in the machine room, rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.

Low power consumption: When the hydraulic guide rail lifting platform descends, it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.


HeidelbergElectric automatic elevatorHow much is it



Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion,Heidelberg10 meter electric elevator, Terrace, Tower, Pavilion; Ideal props.

The device should be used within the valid calibration period and operate effectively and reliably. The anti fall safety device should have a valid inspection certificate (or inspection report) and the validity period should not exceed 1 year. Anti fall safety devices have been manufactured for five years

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

Project scope.The use of standard section connecting bolts should comply with the user manual and specification requirements.

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

When the wall bracket adopts non matching standard products, guardrails, protective covers, platforms and stairs, etc.

Welcome calls .Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

Construction electric elevators should be equipped with travel limit switches, as follows: automatic reset type upper and lower limit switches should be installed on construction electric elevators, but the upper and lower limit switches should not be triggered as high

Mechanical devices controlled by cage movement should not be used to open or close the landing door.

Heidelberg.Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective,HeidelbergElectric scissor lift, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.

Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.