WehrovoBoarding bridge platformProvide technical upgrade services

announcer:hp161HP196399230 release time:2024-01-09 10:18:03

The correct operation of the hydraulic boarding bridge is good maintenance, and how to operate it correctly. Let me briefly introduce the operating steps of the hydraulic boarding bridge, hoping to bring more help to everyone.

The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

Wehrovo.Please check if the power supply is stable and if there is a disconnection in the circuit. If everything is checked to be normal, it should be considered whether there is built-in power

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing) indicator light on, motor rotates but lifting platform does not rise, lowering valve is open overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

.The pressure on the axle will reduce the service life of the boarding axle.

The hydraulic boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods, and is our good helper. However, malfunctions during use are inevitable. What should we do when encountering a malfunction?

Slowly reverse and park the container under the lip at the front of the boarding bridge.


WehrovoBoarding bridge platformProvide technical upgrade services



The electronic operation is very simple. With just one button, the air conditioning panel will automatically rise. Release the button, adjust the plate to reduce itself, and the hinge is used on the truck.

In the economic field, the safety,WehrovoThe boarding bridge, punctuality, flexibility, and price to efficiency ratio of transportation are directly related to the fate and survival of enterprises due to different road conditions. Therefore,WehrovoBoarding axle moving hydraulic pressure, people have high expectations for commercial freight hydraulic boarding bridges,WehrovoHydraulic mobile boarding bridge, especially those that serve as the main components of trailers and semi trailers. Continuously developing, developing, and producing multiple series and varieties of hydraulic boarding bridges to meet the needs of modern cargo transportation. Below is an introduction to the characteristics of the hydraulic boarding bridge suspension system.

Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.

Excellent service.Open planning before placement makes it easy to clean up clutter.

It is strictly prohibited to apply excessive pile loads around the foundation pit.

The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!


WehrovoBoarding bridge platformProvide technical upgrade services



Install drainage ditches on the ground near the pit of the simple boarding bridge, surface, and foot of the slope, especially for the simple boarding bridge.

original.After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.

(5) Each mechanism in the elevator should be checked for normal operation and any noise or other malfunctions. If any, they should be promptly addressed and resolved. All wires and cables in the mobile boarding bridge should be checked for any damage or damage, and if any, they should be promptly wrapped or replaced with new ones.

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.

Wehrovo.Operation degree: There are two types of operations that can be used to raise and lower the boarding bridge. One is a manual pump station, which uses manual hydraulic lifting, which is labor-intensive and somewhat labor-intensive. Advantages: It can be operated and used in any situation. Two types of electric pump stations use electric hydraulic lifting and lowering which reduces labor intensity and saves labor. Disadvantage: Once the power is cut off, it will not be able to be used, but now there are both manual and electric boarding bridges that are more convenient to use.

As an important part of the boarding bridge, the height can be adjusted according to the different vehicles of the goods, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.