RubinFixed hydraulic boarding bridgeneed

announcer:hp161HP196399230 release time:2023-08-09 09:34:31

The precautions during the use of hydraulic boarding bridges are hoped to be helpful to you.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

Rubin.Drain all the hydraulic oil in the oil tank, open the oil tank, take out the oil suction filter, clean it, and return it to the oil tank. Install it in its original position. Fill the fuel tank with new oil.

  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.

.The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

Operation degree: There are two types of operations that can be used to raise and lower the boarding bridge. One is a manual pump station, which uses manual hydraulic lifting, which is labor-intensive and somewhat labor-intensive. Advantages: It can be operated and used in any situation. Two types of electric pump stations use electric hydraulic lifting and lowering, which reduces labor intensity and saves labor. Disadvantage: Once the power is cut off, it will not be able to be used, but now there are both manual and electric boarding bridges that are more convenient to use.

The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.


RubinFixed hydraulic boarding bridgeneed



The hydraulic lifting boarding bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other handling vehicles can directly enter the truck for batch loading and unloading of goods, and single person operations can achieve fast loading and unloading of goods. Reduce a large amount of labor, improve work efficiency, and achieve greater economic benefits for enterprises.

Usage environment: Able to adapt to specific working environments, such as working in highly corrosive, dusty, high-temperature, and low-temperature environments.

The width of the boarding bridge also requires a certain width of its own. However, if the width is too small, it is not conducive to forklift loading and unloading of goods. If the width is too large, it can occupy a certain space, which is not necessary. So a reasonable width is necessary, usually the width of the electric hydraulic boarding bridge is 1800mm, 2000mm, and 2100mm. The width of the bridge is divided into internal width and total width. As we have already mentioned, the internal width is the width of the passage, which is the width of the channel.

install.Nowadays, the electric hydraulic boarding bridge has become a loading and unloading tool used by many companies. Compared to many friends, I am still not very familiar with electric hydraulic boarding bridges. Below the editor will explain the product parameters and specifications related to the length, slope, and height of the electric hydraulic boarding bridge.

When working on the hydraulic boarding bridge, the support legs must be extended, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.

The hydraulic lifting boarding bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other handling vehicles can directly enter the truck for batch loading and unloading of goods, and single person operations can achieve fast loading and unloading of goods. Reduce a large amount of labor, improve work efficiency, and achieve greater economic benefits for enterprises.


RubinFixed hydraulic boarding bridgeneed



Nowadays the electric hydraulic boarding bridge has become a loading and unloading tool used by many companies. Compared to many friends, I am still not very familiar with electric hydraulic boarding bridges. Below, the editor will explain the product parameters and specifications related to the length, slope, and height of the electric hydraulic boarding bridge.

packing.The pressure on the axle will reduce the service life of the boarding axle.

Regularly draining and refilling the oil tank to remove water and sediment is crucial for removing impurities in the oil, but regularly emptying the entire hydraulic system is also crucial. This is a reliable way to completely remove system impurities, oxidized hydraulic oil, and other harmful substances. Then, the recommended clean hydraulic oil should be added back to the system. If the oil is completely contaminated, especially when the pump is damaged,RubinMobile boarding axle hydraulic pressure, the oil in the tank must be cleaned. The oil cleaning device allows the oil to flow until the oil pollution indicator shows that the oil is in a satisfactory state.

For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

Rubin.Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button motor rotates but lifting platform does not rise, lowering valve is open,RubinTruck boarding bridge, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

There is a flip plate at the top of the bridge deck, the relief valve gets stuck or severely worn and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.