WeltContainer boarding bridgeFAQ

announcer:hp161HP196399230 release time:2024-08-04 11:33:09

Slowly reverse and park the container under the lip at the front of the boarding bridge.

To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, slowly lower the boarding bridge, and secure more than 90% of the lip plates at the bottom of the container.

.What is a hydraulic boarding axle? The hydraulic boarding bridge is a special auxiliary equipment used for fast loading and unloading of goods, and its height adjustment function can build a bridge between the truck and the warehouse platform. What are the operational steps we take during use?

Common&quo; Streamline” Open joint planning, with a welding area more than three times that of other traditional pipeline joints, greatly extending the service life and protection life.

The hydraulic boarding bridge not only reduces labor intensity but also doubles the efficiency of loading and unloading operations, accelerates logistics speed, and achieves significant economic benefits. Hydraulic loading and unloading bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other transport vehicles can directly enter the truck for batch loading and unloading of goods, also known as loading and unloading platforms.


WeltContainer boarding bridgeFAQ



As an important part of the boarding bridge, the height can be adjusted according to the different vehicles of the goods, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm which can be met by almost all freight vehicles (with a general vehicle height of 1600).

Features: Adopting a foldable arm (two section arm, three section arm), with a working height of 15-45 meters, and the lifting arm can rotate 360 degrees;, Both the turntable and the work platform can be operated. The work platform can safely walk with the boom in any position, and use directional switches to switch between the upper and lower platforms.

The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

query.During excavation, if unidentifiable items or unforeseeable situations are found, the operation should be stopped in a timely manner and reported to the person in charge of the hydraulic boarding bridge for handling. The fixed boarding bridge is an auxiliary equipment for loading and unloading in conjunction with the storage platform. This equipment is integrated with the platform and can be adjusted up or down according to the different heights of the truck carriage, making it convenient for forklifts to enter the carriage. The equipment adopts an imported hydraulic pump station with anti rolling skirts on both sides, making work safer and improving work efficiency.

Shake the handle to raise the boarding bridge to the height of the container.

Nowadays, the electric hydraulic boarding bridge has become a loading and unloading tool used by many companies. Compared to many friends, I am still not very familiar with electric hydraulic boarding bridges. Below, the editor will explain the product parameters and specifications related to the length, slope, and height of the electric hydraulic boarding bridge.


WeltContainer boarding bridgeFAQ



During the excavation process of the foundation pit of the simple boarding bridge,WeltTrain boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

Create brilliance.When it comes to fixed hydraulic boarding bridges, I believe

Advantages: Simple operation structure, convenient operation, safety and reliability,WeltMobile boarding bridge, beautiful appearance, making it a high-altitude work equipment with better safety and work efficiency.

The hydraulic lifting boarding bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other handling vehicles can directly enter the truck for batch loading and unloading of goods, and single person operations can achieve fast loading and unloading of goods. Reduce a large amount of labor, improve work efficiency, and achieve greater economic benefits for enterprises.

Welt.  1. Before use check the boarding bridge for obvious damage such as cracks and broken wires.

The hydraulic boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods,WeltDesign of mobile boarding bridge, and is our good helper. However, malfunctions during use are inevitable. What should we do when encountering a malfunction?

For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.