AnshanHydraulic fixed boarding bridgeHow to construct

announcer:hp161HP196399230 release time:2024-05-12 17:30:35

During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

Is the boarding bridge easy to use? Those who have used the boarding bridge know that it is a very useful mechanical equipment, which brings great convenience to the logistics industry and some industrial factories that need to load and unload goods. Some enterprises also value the development prospects of the boarding bridge and set up factory boarding bridges. High priced and various specifications of boarding bridge manufacturers provide timely supply, with high cost-effectiveness, and has become the preferred brand for many wire products. Welcome to choose!

Anshan.Please check if the power supply is stable and if there is a disconnection in the circuit. If everything is checked to be normal, it should be considered whether there is built-in power

Portable hydraulic press boarding bridge: It is a widely used type suitable for places where loading,AnshanMounted axle hydraulic fixed type, unloading, and transportation are not fixed or moving; Mobile hydraulic press boarding bridge: suitable for fixed and immovable goods such as ports, cargo platforms, warehouses, etc

.As an important part of the boarding bridge, the height can be adjusted according to the different vehicles of the goods, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

As we all know

During the excavation process of the foundation pit of the simple boarding bridge,AnshanFolding boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.


AnshanHydraulic fixed boarding bridgeHow to construct



The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!

Introduction to Fixed Boarding Bridge Loading and unloading Mobile Boarding Bridge is a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise's logistics chain, and is a loading and unloading platform vehicle for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform truck is fixed, but the height of the transport carriages does not always form a certain height difference or gap between the transport vehicle and the loading and unloading platform. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to quickly enter and exit transportation vehicles for loading and unloading operations.

Reason for the lifting table not lowering: The lowering valve is malfunctioning, and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button, check if the lowering valve is energized. If there is no electricity, try to eliminate it; If there is electricity, troubleshoot the lowering valve itself or replace the lowering valve. The lowering valve should be kept clean.

Application process.When working on the hydraulic boarding bridge, the support legs must be extended,AnshanMobile boarding bridge, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.

For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.


AnshanHydraulic fixed boarding bridgeHow to construct



Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

manufacturer.There is a flip plate at the top of the bridge deck, which is placed at the edge of the carriage to ensure a smooth transition between the passage and the carriage. Its advantages are as follows.

Features: Utilizing a sleeve type drag chain structure to achieve high-altitude operation with telescopic arms, the platform vehicle can achieve 360° Rotating, both the work platform and the platform truck can be operated. The work platform truck can safely walk with the boom in any position, and the walking speed decreases with the rise of the lifting height.

When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.

Anshan.Install a 5m high protective railing around the foundation pit of the simple boarding bridge, with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate, without the need for power supply, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, support first and then excavation, no overbreak&rquote; The principle of.

What are the issues to pay attention to when using the boarding bridge? For example, mobile boarding bridges are generally used outdoors, and after use, they are also placed outdoors. They are often exposed to wind, rain and sunlight, which reduces the lifespan of the boarding bridge. Therefore, the maintenance of the boarding bridge is very important. When it rains, cover the boarding bridge with a rain cloth to prevent rusting and aging.

Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.