BaltimoreHydraulic boarding axle fixationReduce radioactive pollution

announcer:hp161HP196399230 release time:2024-05-12 11:12:27

The electronic operation is very simple. With just one button, the air conditioning panel will automatically rise. Release the button adjust the plate to reduce itself, and the hinge is used on the truck.

The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time,BaltimoreFinished boarding bridge, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel so that they can handle faults in a short period of time.

Baltimore.Advantages: Simple operation structure, convenient operation, safety and reliability, beautiful appearance, making it a high-altitude work equipment with better safety and work efficiency.

Open planning before placement makes it easy to clean up clutter.

.When confirming that the lip is fixed to the container, pull out the hook to hook it into the container, tighten the chain to ensure that it does not loosen,BaltimoreMobile hydraulic boarding bridge, and press the brake blocks on both sides. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

The hydraulic boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods, and is our good helper. However, malfunctions during use are inevitable. What should we do when encountering a malfunction?

Connection for. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.


BaltimoreHydraulic boarding axle fixationReduce radioactive pollution



Slowly reverse and park the container under the lip at the front of the boarding bridge.

The outstanding characteristics of air suspension are good smoothness, less maintenance long service life, significant improvement in protection of cargo compared to steel plate suspension, and greatly reduced damage to the entire vehicle and road surface. The leaf spring produces different bending under different loads, so the distance between the whole vehicle and the ground is always changing. If the load is increased while keeping the spring unchanged, it will also reduce the natural frequency of the spring and even change the characteristics of the spring. The air spring is based on the compressibility of air. The air enclosed in the air bag is an element. Different air bag pressures of the air spring system balance different loads. When the height of the air bag is fixed, the distance between the car body and the road surface remains unchanged.

Slowly reverse and park the container under the lip at the front of the boarding bridge.

Professional is king.During excavation, if unidentifiable items or unforeseeable situations are found, the operation should be stopped in a timely manner and reported to the person in charge of the hydraulic boarding bridge for handling. The fixed boarding bridge is an auxiliary equipment for loading and unloading in conjunction with the storage platform. This equipment is integrated with the platform and can be adjusted up or down according to the different heights of the truck carriage, making it convenient for forklifts to enter the carriage. The equipment adopts an imported hydraulic pump station with anti rolling skirts on both sides, making work safer and improving work efficiency.

The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed,BaltimoreLogistics boarding bridge, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

These are the options for hydraulic oil for mobile boarding bridges.


BaltimoreHydraulic boarding axle fixationReduce radioactive pollution



Install a 5m high protective railing around the foundation pit of the simple boarding bridge, with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate, without the need for power supply, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, support first and then excavation, layered excavation, no overbreak&rquote; The principle of.

Welcome calls .The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

Please check if the power supply is stable and if there is a disconnection in the circuit. If everything is checked to be normal, it should be considered whether there is built-in power

Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.

Baltimore.Hydraulic boarding bridges should strictly adhere to the principle of being overweight, I will take you to understand!