ZhuozhouLifting and lowering of boarding bridgePressure algorithm

announcer:hp161HP196399230 release time:2024-02-04 12:52:57

For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

Install drainage ditches on the ground near the pit of the simple boarding bridge,ZhuozhouBoarding axle hydraulic pressure, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.

Zhuozhou.Used for cargo platforms and mobile loading and unloading sites without loading and unloading equipment, it is a cargo loading and unloading auxiliary equipment used in conjunction with forklifts. With the help of hydraulic loading bridges, forklifts can directly enter the interior of car containers for bulk loading and unloading operations. It only needs single person operation and no power supply to realize safe and fast loading and unloading of goods, which can reduce labor intensity, double the efficiency of loading and unloading operations, speed up the flow of materials, and obtain greater economic benefits.

The hydraulic lifting boarding bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other handling vehicles can directly enter the truck for batch loading and unloading of goods, and single person operations can achieve fast loading and unloading of goods. Reduce a large amount of labor, improve work efficiency and achieve greater economic benefits for enterprises.

.When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge as well as noise when the pump station enters the air.

Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.

The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.


ZhuozhouLifting and lowering of boarding bridgePressure algorithm



During use, close attention should be paid to the condition of the equipment, and if there are any problems, the use should be stopped immediately.

B) When maintaining the hydraulic system, only clean plastic plugs can be used to seal the ends of the pipeline.

As an important part of the boarding bridge, the height can be adjusted according to the different vehicles of the goods, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

Application process.Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.

  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.

As we all know


ZhuozhouLifting and lowering of boarding bridgePressure algorithm



The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform and there is basically no change to the building structure.

Safety production.During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

There are the following: (1) The brake of the elevator should be regularly inspected to see if its clearance is appropriate, as well as some other aspects, in order to ensure its flexibility and reliability in use. In addition, on the friction surface of the brake, it is necessary to check for any dirt, and if any, it should be cleaned in a timely manner. (2) For the part of the moving boarding bridge, it should be carried out in accordance with the specified requirements, as too much can also cause problems.

During the application process of hydraulic boarding bridges, it is necessary to follow the operating procedures to ensure the normal operation of the equipment. What precautions should we take when using hydraulic boarding bridges?

Zhuozhou.Monthly maintenance of hydraulic boarding bridges: check for wear on rollers,ZhuozhouHydraulic boarding bridge, intermediate shafts and bearings, cylinder pins and bearings, boom hinge shafts and bearings, etc; The oil quality and level of hydraulic oil; The hydraulic boarding bridge should be raised throughout the entire process, and at this position, the hydraulic surface should be 40 to 50 millimeters higher than the bottom of the box. The hydraulic oil is darkened,ZhuozhouProvincial Mobile Boarding Bridge, sticky, or has foreign objects such as gravel. If found, it should be replaced in a timely manner; Add some oil to each part to extend the service life of the bearing. The hydraulic boarding bridge has a wide range of uses. Doing the above points well not only ensures your personal safety but also extends the service life of the equipment, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

Common&quo; Streamline” Open joint planning with a welding area more than three times that of other traditional pipeline joints, greatly extending the service life and protection life.