NajinIntroduction to oil immersed transformerWhat is the temperature allowable stress

announcer:hp122HP117294921 release time:2024-01-07 13:07:05

Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.

After tightening the loose bolts,NajinLightning protection of distribution transformer, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.

Najin.After the power transformer has been used for a long time common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:

Naturally,NajinHow much is the European box transformer, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire please be rational to make the oil immersed transformer safer and more efficient.

.For no-load impulse closing of transformer, pay attention to the following matters:

The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.

Dry type transformer company


NajinIntroduction to oil immersed transformerWhat is the temperature allowable stress



The manufacturing process of dry-type transformer is very process, and must be technically as a certain pillar. Only in that way, it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

Interpretation and observation.The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity,Najin200 KVA oil immersed transformer, while oil transformer has better load working capacity.

Protective measures for damping of dry-type transformer

Sound in case of phase failure


NajinIntroduction to oil immersed transformerWhat is the temperature allowable stress



What is the wavelength of oil immersed transformer?

system.When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?

The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing, remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask, etc.

When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.

Najin.The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, and the time interval of each closing shall not be less than 5min.

Oil leakage of bolt or pipe external thread

(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m, and a guardrail of no less than 7m shall be installed around it, and a warning sign shall be hung at a prominent position.