Hui sangdongCharacteristics of oil immersed transformerAutomatic sealing performance characteristics

announcer:hp122HP117294921 release time:2024-01-07 13:00:36

Oil leakage at looper flange

Dry type transformer manufacturer

Hui sangdong.When the operating oil is mixed with different types of new oil or used for oil, in addition to the accurate measurement of the cold filter point of the mixed oil, and observe the sludge accumulation. The accumulation cannot be accessed. The results of the operation of the mixing template are not that the original oil is very poor, so it can be managed and used in a mixed manner.

For 630kVA power engineering transformer,Hui sangdong630 dry type power transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

.Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.

The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.


Hui sangdongCharacteristics of oil immersed transformerAutomatic sealing performance characteristics



Falling foreign matters and piercing

The common dry-type transformer is an important electrical equipment, and the voltage is constantly regulated. However, because of certain necessity, the dry-type transformer will also boost voltage,Hui sangdongType of dry-type transformer, and the whole process of boosting voltage is very complex, and there are many principles.

If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption,Hui sangdongScb10 dry type transformer, which is not suitable for too large or too small.

total cost.When the screw of the through core extruder holding the iron core of the transformer is loose, there are screw cap parts left on the iron core, or small metal materials fall into the transformer, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak squeak & rdquo; It's like a magnet sucking a small washer, while the working voltage, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer, and can be solved until power failure.

Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.

Loose core screw


Hui sangdongCharacteristics of oil immersed transformerAutomatic sealing performance characteristics



Fault judgment of power transformer

Sales Department.Brief introduction of zero line of power transformer

The cycle time of power-off cleaning and inspection shall be determined according to the surrounding environment and load conditions, generally from half a year to once a year;

Power transformers are also used for testing which are called test power transformers. They can be divided into inflatable, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.

Hui sangdong.Connection group structure of dry-type transformer

The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, the good model is the solid model of infinite transformer core column, but there are many calculation methods.

Falling foreign matters and piercing