Gipi JapaState Grid transformer won the bidResources are significantly reduced

announcer:hp122HP117294921 release time:2023-12-21 11:49:30

On load commissioning:

Dry type transformer

Gipi Japa.How to maintain dry-type transformer?

Power transformer manufacturer

.Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.

The noise of dry-type transformer comes from

The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.


Gipi JapaState Grid transformer won the bidResources are significantly reduced



After tightening the loose bolts, seal the flange and solve the bolts that are likely to leak, apart from the application of the Finance Bureau, the industry has been trying to formulate and upgrade transformer commodities according to the specifications, so as to promote the improvement of energy consumption level of transformer commodities.

Then clamp the branch pipe with your thumb, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.

Direct material.Analysis of common faults of oil immersed transformer:

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore,Gipi JapaDry type transformer controller, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.


Gipi JapaState Grid transformer won the bidResources are significantly reduced



Connection group structure of dry-type transformer

quality.Therefore, in the installation process of substation equipment the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.

Dry type transformer is a common electrical equipment, such as variable frequency power supply.

The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

Gipi Japa.When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself,Gipi JapaThree phase transformer 380V to 208v,Gipi JapaPower transformer specification, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.

Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.