ZandanLoss of power transformerContainer volume calculation method

announcer:hp122HP117294921 release time:2024-09-13 09:53:27

The voltage regulating tap changer is not in place or poor

Oil leakage at electric welding position

Zandan.How is the quality level of dry-type transformer compared with foreign countries?

The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, needle holes, the electromagnetic induction vibration will crack the electric welding and lead to leakage.

.If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.


ZandanLoss of power transformerContainer volume calculation method



The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

The person in charge of a transformer manufacturer said that because of the hazards of raw materials and other factors, the cost of energy-saving transformers is significantly higher than that of traditional transformers and the price factor is also a key factor endangering the popularization and marketing of energy-saving transformers. Although there are energy-saving and convenient subsidy projects to help energy-saving transformers, the market has not yet fully operated.

The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.

Honesty is the foundation.Oil leakage of porcelain pot and laminated glass oil level gauge

Causes of fire in power transformer

The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?


ZandanLoss of power transformerContainer volume calculation method



When sampling in bulk gasoline barrels,ZandanTransformer three-phase transformer, samples shall be selected according to 5% of the number of gasoline barrels, but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to 2% of the total number of barrels (bottles).

Where can I find it?.The flange surface is uneven the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

The insulation of the through core anchor bolt clamping the iron core is damaged,ZandanDry type transformer industry market,ZandanRecovery price of dry-type transformer, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;

Manufacturing process and steps of dry-type transformer

Zandan.When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.

Oil immersed transformer company