Briseni380V to 660V three-phase transformerThe standard range of materials used

announcer:hp122HP117294921 release time:2024-09-12 17:11:30

Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

From the appearance the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, different oil-based oils cannot be mixed. Under special circumstances, if it is necessary to use new oil of different grades,BriseniParameters of oil immersed transformer, it should be determined whether the mixed oil with ice degree can be used according to the requirements of the region, and then the oil mixing test should be carried out.

The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the 45 degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, it can be transferred to on-load operation and has sound insulation and noise reduction.

.After no-load test run is normal for 24h, and the load shall be gradually increased from 25%, 50% and 75% by grade.

Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.

Before and after sampling,BriseniOil immersed self cooling transformer, clean the periphery of the sampling port with clean or hairless linen.


Briseni380V to 660V three-phase transformerThe standard range of materials used



In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

What is the cause of power transformer core failure?

Power transformers are used in all walks of life

Welcome calls .Oil immersed transformer operation

Careless maintenance and insulation damage

Oil leakage at electric welding position


Briseni380V to 660V three-phase transformerThe standard range of materials used



Operation and maintenance management of oil immersed transformer

system.Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;

The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the 45 degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.

Briseni.(5) the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator,BriseniVoltage transformer, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.

For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

Power transformer manufacturer