VarenaWhat are the test items of dry-type transformerCorrosion failure analysis

announcer:hp122HP117294921 release time:2024-09-12 11:45:42

Dry type transformer manufacturer

Different diversion methods, while oil transformers mostly use porcelain waterproof casing;

Varena.The iron loss of transformer includes two levels. The first is the hysteresis loss introduced by the transformer manufacturer. When the AC circuit is based on the transformer, its orientation and size change with the change, releases energy, and then loses part of electromagnetic energy, which is the hysteresis loss. The other is the vortex loss when the transformer is working.

The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.

.It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

Power transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.


VarenaWhat are the test items of dry-type transformerCorrosion failure analysis



When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.

Maintenance contents of power transformer

What is the important role of power transformer

Process inspection.Before no-load impulse closing the transformer shall be placed for 24h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core,VarenaDistribution rectifier transformer, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.

Power transformer manufacturer


VarenaWhat are the test items of dry-type transformerCorrosion failure analysis



The flange surface is uneven, the tightening bolts are loose and the installation and processing process is wrong,VarenaBox transformer recycler, so that the bolts are not tightened well,VarenaPower supply and distribution transformer, resulting in oil leakage.

offer.Power transformer

Step up process of dry-type transformer?

The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.

Varena.After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.

High voltage fuse of transformer breaks one phase;

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.