When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.

Before no-load impulse closing, the transformer shall be placed for 24h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

Old city.For oil transformer oil replenishment, unused transformer oil conforming to the new standard should be selected first. In addition, the oil with the same basic, same brand and same additive type is expected to have a stronger effect. The characteristics of the oil should not be lower than that of the oil in mechanical equipment. When the new remaining oil is less than 5%, there is generally no problem. However, if there is more new remaining oil, oil shall be added before oil type Chromatographic analysis and pressure test shall be carried out to establish that there is no oil stain, and the acid value and dielectric loss shall not exceed the oil in the machinery and equipment.

The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side),Old cityDistribution transformer gear, and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.

.After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.

(I) the distance between the external contour of 10kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than 1m; At the angle with actual operation, a spacing of more than 2m shall be reserved; If metal fence is selected,Old cityDry type transformer scb13-1250kva, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.

For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.


Old cityInstallation requirements for indoor oil immersed transformerRepair and maintenance instructions



Dry type transformer manufacturer

Right, the utilization rate is close After replacing one 255kva small transformer, but the main parameters of the two transformers are evaluated as shown in Table 1. Table 1 evaluates the main parameters of the transformer: capacity (VA) iron loss (W) copper loss (W). Firstly, the output power is saved according to the customary calculation method (ignoring copper loss): the results show that the loss of large capacity transformer is lower than that of small capacity transformer, It actually consumes electromagnetic energy.

In fact, safety factor grounding device can be divided into grounding protection, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.

Home page recommendation.When leaving the factory the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.

Manufacturing process and steps of dry-type transformer

After the oil is drained, and the lifting point shall be on the common earrings or bolts. If necessary all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, the human resources traction belt shall be used as a guide.


Old cityInstallation requirements for indoor oil immersed transformerRepair and maintenance instructions



After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.

Where is good.Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.

Precautions for trial operation of power transformer manufacturers

(III) dry type transformers of 315KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than 5m; The distance between the electrified part and the road surface shall not be less than 5m.

Old city.The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.

If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.

Therefore, in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear,Old cityInternal structure diagram of oil immersed transformer, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.