NtongamoTransformer 500 box typeApplication in intensive care

announcer:hp122HP117294921 release time:2024-08-17 10:35:54

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.

Ntongamo.At that time, only a few companies in China could produce 500kV high-voltage transformers and the market share of high-voltage transformers was basically monopolized by overseas leaders.

The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.

.After no-load test run is normal for 24h maintenance and transportation, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.

The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω, The resistor is generally more than 2000 & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only 1 / 500 of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.


NtongamoTransformer 500 box typeApplication in intensive care



When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent,NtongamoMaintenance of box transformer, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

Precautions for trial operation of power transformer manufacturers

Oil leakage of porcelain pot and laminated glass oil level gauge

Bidding.In the electric field of the winding to the yoke, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.

Oil leakage of porcelain pot and laminated glass oil level gauge

It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, laminated glass and other materials very well, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core,NtongamoPower Bureau transformer, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.

average method.The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of 0.5kg or 1kg. 2-3 bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source sampling date, sampling person, weather conditions and other materials of the oil sample.

How to select dry-type transformer

Oil immersed transformer operation

Ntongamo.After 24 hours of continuous trial operation with a certain load, and the transformer will turn to all normal operation.

Power transformer factory

Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.