ZaoS11 dry type transformer manufacturerExecutive standard

announcer:hp122HP117294921 release time:2024-08-06 10:04:55

Sound in case of phase failure

Sound in case of phase failure

Zao.The domestic transformer market is slow

The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.

.Power transformer

Connection group structure of dry-type transformer

Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation,ZaoAll transformers, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.


ZaoS11 dry type transformer manufacturerExecutive standard



Oil leakage at electric welding position

Transformer inspection ear

The noise of dry-type transformer belongs to low-frequency noise. In a small area, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building, and then causes gas vibration noise, which is then scattered to the ears of consumers. Although the amount of noise is not very large,ZaoPrice of scb11 series dry type transformer, the dispersion spacing and adverse effects are very large.

Where is good.Noise dispersion of dry-type transformer

The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.

After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.


ZaoS11 dry type transformer manufacturerExecutive standard



The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

Create brilliance.If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings wear 4 round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm,ZaoPower station transformer, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, and rotate the crane to place the bell cover on the clean skid.

Transformer inspection ear

Careless maintenance and insulation damage

Zao.When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.

For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure, damage to machinery and equipment, etc.

After the oil is drained, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.