TallacPower transformer insulating oil testHow to ensure quality in the production process

announcer:hp122HP117294921 release time:2024-07-10 12:20:14

The key reason for oil leakage is that there are defects in cast iron parts

Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

Tallac.Overtemperature alarm and trip: collect winding or iron core temperature data signals according to the temperature measurement resistor of PTC discrete system thermistor embedded in the bottom voltage winding. When the transformer winding temperature rises again, if it reaches 155 ℃, the system software outputs the overtemperature alarm system; If the temperature rises to 170 ℃ again and the transformer can no longer operate, the overtemperature trip data signal must be transported to the secondary maintenance circuit, and the transformer shall be tripped quickly.

For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure, damage to machinery and equipment,TallacSpecification for dry type transformer grounding,TallacDry type transformer box transformer, etc.

.The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.

Wiring mode of dry-type transformer:

For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure, damage to machinery and equipment etc.


TallacPower transformer insulating oil testHow to ensure quality in the production process



Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal,Tallac160KV oil immersed transformer, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.

Visual inspection method for transformer inspection

Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, voltage transformation and blood pressure reduction must be carried out by the transformer.

Which one is better.Noise solution of dry-type transformer

After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.

It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.


TallacPower transformer insulating oil testHow to ensure quality in the production process



The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

Where is good.Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.

Several detection methods for installing transformer

After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.

Tallac.Fault judgment of power transformer

When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.

Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.