MartabanBox type transformerCommon defects in the industry

announcer:hp122HP117294921 release time:2024-07-07 12:35:28

Equipped with a temperature controller,MartabanTransformer power capacitance, platinum thermistor (pt10) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.

Power transformer factory

Martaban.How to maintain dry-type transformer?

What is the important role of power transformer

.According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.

After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.

Noise solution of dry-type transformer


MartabanBox type transformerCommon defects in the industry



On load commissioning:

Transformer inspection nose sniffing method

The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults, common faults and impact. The work is diligent.

Quotation sheet.During no-load test run, and then make the working voltage impulse closing.

The project cost is different. Compared with the purchase price of capacity transformer the purchase price of dry-type transformer is much higher than that of oil immersed transformer.

Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short,MartabanRecovery of electric cabinet transformer, voltage transformation and blood pressure reduction must be carried out by the transformer.


MartabanBox type transformerCommon defects in the industry



The input and output three-phase power lines shall be connected to phase a, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.

Manufacturing cost.What is the wavelength of oil immersed transformer?

The insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;

Wiring mode of dry-type transformer:

Martaban.The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

When checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken,MartabanPower electronic control, if you work again, turn on the photo flash when it's light, and it's short when it's heavy. Therefore, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance, experts can inspect special tools, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.

After no-load test run is normal for 24h, it can be transferred to on-load operation, 50% and 75% by grade.