ShadalaTransformer seriesMaintenance and troubleshooting methods of operation

announcer:hp122HP117294921 release time:2024-07-05 09:07:17

Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded,ShadalaS11 dry type transformer manufacturer,ShadalaDifference between transformer and box transformer, or there is local sound, The resistor is generally more than 2000 & omega; the load can be reduced or the operation of the transformer can be stopped.

The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω, According to Ohm's law, when the insulating layer is damaged, the current is only 1 / 500 of the total current flow, so as to play a guarantee effect. The higher the voltage the smaller the resistance, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.

Shadala.With Vietnam and Malaysia,ShadalaS9 oil immersed transformer, China's first UHV transmission experimental demonstration project China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.

The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.

.When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.

From the appearance, the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;


ShadalaTransformer seriesMaintenance and troubleshooting methods of operation



Power transformer manufacturer

Dry type transformer is a common electrical equipment, which can be used to convert the alternating voltage of one standard value into another standard value of the same frequency. The step-up dry-type transformer is used to convert the low-grade alternating voltage into another high-grade alternating voltage of the same frequency. It is widely used in high-frequency industries, such as variable frequency power supply.

It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.

Workshop cost.The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by 20%.

Deterioration damage of transformer core insulation

Connection group structure of dry-type transformer


ShadalaTransformer seriesMaintenance and troubleshooting methods of operation



When sampling in bulk gasoline barrels, samples shall be selected according to 5% of the number of gasoline barrels, but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to 2% of the total number of barrels (bottles).

Good reputation.The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, which is conducive to adjusting the data and has a unique and neat style.

Automatic system of centrifugal fan: measure the temperature data signal according to the PT100 thermistor temperature measuring resistor of the embedded parts at the hot part of the bottom pressure winding. The transformer load expands and the operating temperature increases. When the winding temperature reaches 110 ℃, the system software automatically starts the centrifugal fan for refrigeration; When the winding temperature is as low as 90 ℃, the system software will automatically terminate the centrifugal fan.

The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.

Shadala.Protective measures for damping of dry-type transformer

Dry type transformer manufacturer

In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.